X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354111510000

Well Details

Well ID: 0354111510000
Loading map...
Location: 00/10-15-035-11W4/0
Location Alias: 00/10-15-35-11 W4M
Location Alias 2: 00/10-15-035-11 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 11
Section: 15
County/Municipality: County of Paintearth No. 18
Well Name: ANDEX ET AL PROVO 10-15-35-11
Operator Name: Canadian Natural Resources Limited
License Number: 0047260
License Date: 1973-09-17
License Status: RecCertified
Spud Date: 1973-09-19
Final Drill Date: 1973-09-22
Well Total Depth: 936.00 m
Surface Hole Latitude: 52.007275
Surface Hole Longitude: -111.489517

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-09-17 Obtained License
1973-09-22 Finished Drilling
1973-09-22 Production Casing Operation Performed
1973-09-22 Well Mode changed to Drilled and Cased
1973-10-27 Perforation Treatment Performed - Jet Perforation
1973-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-11-27 Perforation Treatment Performed - Fractured
1974-07-06 Well Began Production
1974-07-06 Well Fluid changed to Crude Oil
1974-07-06 Well Mode changed to Pumping
1974-09-01 Well Fluid changed to Crude Oil
1974-09-01 Well Mode changed to Suspended
1981-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-09-01 Plug Back Performed
1981-09-02 Perforation Treatment Performed - Jet Perforation
1987-02-10 Well Log Performed
1987-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-02-11 Plug Back Performed
1987-02-11 Well Abandoned
1987-02-11 Well Fluid changed to Crude Oil
1987-02-11 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-10-27 Perforation 904.30 905.90 7
1973-11-27 Acid Treatment 904.30 905.90 0
1973-11-27 Fracture 904.30 905.90 0
1981-09-01 Packing Device Capped w/Cement 887.00 895.00 0
1981-09-02 Perforation 217.90 226.20 0
1981-09-02 Perforation 150.00 156.10 0
1987-02-11 Packing Device Capped w/Cement 137.00 145.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 1368 0.0 0.0 0.0

For data sources see[5]

References