X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354112404000

Well Details

Well ID: 0354112404000
Loading map...
Location: 00/04-24-035-11W4/0
Location Alias: 00/04-24-35-11 W4M
Location Alias 2: 00/04-24-035-11 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 11
Section: 24
County/Municipality: County of Paintearth No. 18
Well Name: CIGOL APACHE PROVOST 4-24-35-11
Operator Name: Hamcor Resources Inc.
License Number: 0042912
License Date: 1972-07-04
License Status: RecCertified
Spud Date: 1972-07-16
Final Drill Date: 1972-07-18
Well Total Depth: 947.90 m
Surface Hole Latitude: 52.013820
Surface Hole Longitude: -111.454060

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-07-04 Obtained License
1972-07-18 Finished Drilling
1972-07-18 Well Mode changed to Drilled and Cased
1972-07-19 Production Casing Operation Performed
1972-08-23 Perforation Treatment Performed - Jet Perforation
1972-08-24 Perforation Treatment Performed - Fractured
1972-10-04 Well Began Production
1972-10-04 Well Fluid changed to Crude Oil
1972-10-04 Well Mode changed to Pumping
1986-03-20 Well Fluid changed to Crude Oil
1986-03-20 Well Mode changed to Suspended
1987-04-23 Well Fluid changed to Crude Oil
1987-04-23 Well Mode changed to Pumping
1987-05-21 Perforation Treatment Performed - Jet Perforation
1987-05-21 Well Log Performed
1992-11-01 Well Fluid changed to Crude Oil
1992-11-01 Well Mode changed to Suspended
1995-08-23 Well Fluid changed to Crude Oil
1995-08-23 Well Mode changed to Closed
1995-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-14 Plug Back Performed
1995-09-14 Well Fluid changed to Crude Oil
1995-09-14 Well Mode changed to Abandoned
1995-09-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-08-23 Perforation 921.10 922.30 13
1972-08-24 Fracture 921.10 922.30 0
1987-05-21 Perforation 916.20 917.40 13
1987-05-21 Perforation 920.70 922.90 13
1995-09-14 Packing Device Capped w/Cement 897.00 905.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 1932 0.0 0.0 0.0
1973 8663 0.0 0.0 0.0
1974 8159 0.0 0.0 0.0
1975 8370 0.0 0.0 0.0
1976 8731 0.0 0.0 0.0
1977 8488 0.0 0.0 0.0
1978 8584 0.0 0.0 0.0
1979 8597 0.0 0.0 0.0
1980 7776 0.0 0.0 0.0
1981 8203 0.0 0.0 0.0
1982 8050 0.0 0.0 0.0
1983 5831 0.0 0.0 0.0
1984 3075 0.0 0.0 0.0
1985 5779 0.0 0.0 0.0
1986 744 0.0 0.0 0.0
1987 5639 0.0 0.0 0.0
1988 6905 0.0 0.0 0.0
1989 412 0.0 0.0 0.0
1991 36 0.0 0.0 0.0
1992 76 0.0 0.0 0.0

For data sources see[5]

References