X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354112610000

Well Details

Well ID: 0354112610000
Loading map...
Location: 00/10-26-035-11W4/0
Location Alias: 00/10-26-35-11 W4M
Location Alias 2: 00/10-26-035-11 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 11
Section: 26
County/Municipality: County of Paintearth No. 18
Well Name: MOSBACHER LL&E HB PROVO 10-26-35-11
Operator Name: Rocky River Resources Ltd.
License Number: 0050467
License Date: 1974-07-16
License Status: RecCertified
Spud Date: 1974-08-12
Final Drill Date: 1974-08-14
Well Total Depth: 960.10 m
Surface Hole Latitude: 52.036595
Surface Hole Longitude: -111.464648

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-07-16 Obtained License
1974-08-14 Finished Drilling
1974-08-14 Production Casing Operation Performed
1974-08-14 Well Mode changed to Drilled and Cased
1974-09-13 Perforation Treatment Performed - Jet Perforation
1974-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-09-18 Perforation Treatment Performed - Fractured
1974-11-11 Well Began Production
1974-11-11 Well Fluid changed to Crude Oil
1974-11-11 Well Mode changed to Pumping
1986-03-06 Well Fluid changed to Crude Oil
1986-03-06 Well Mode changed to Suspended
1987-05-26 Well Fluid changed to Crude Oil
1987-05-26 Well Mode changed to Pumping
1987-11-01 Well Fluid changed to Crude Oil
1987-11-01 Well Mode changed to Suspended
1988-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-07-07 Plug Back Performed
1988-07-07 Well Fluid changed to Crude Oil
1988-07-07 Well Mode changed to Abandoned
1988-08-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-09-13 Perforation 926.30 927.80 13
1974-09-18 Acid Treatment 926.30 927.80 0
1974-09-18 Fracture 926.30 927.80 0
1988-07-07 Packing Device Capped w/Cement 907.00 915.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 1224 0.0 0.0 0.0
1975 8425 0.0 0.0 0.0
1976 8685 0.0 0.0 0.0
1977 8630 0.0 0.0 0.0
1978 8679 0.0 0.0 0.0
1979 6753 0.0 0.0 0.0
1980 8615 0.0 0.0 0.0
1981 8537 0.0 0.0 0.0
1982 5819 0.0 0.0 0.0
1983 8759 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 7992 0.0 0.0 0.0
1986 1584 0.0 0.0 0.0
1987 3078 0.0 0.0 0.0

For data sources see[5]

References