X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354200408000

Well Details

Well ID: 0354200408000
Loading map...
Location: 00/08-04-035-20W4/0
Location Alias: 00/08-04-35-20 W4M
Location Alias 2: 00/08-04-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 04
County/Municipality: County of Stettler No. 6
Well Name: W.W. BRIDGE NO 8
Operator Name: Enhance Energy Inc.
License Number: 0003434
License Date: 1951-09-07
License Status: Abandoned
Spud Date: 1951-09-18
Final Drill Date: 1951-10-18
Well Total Depth: 1629.20 m
Surface Hole Latitude: 51.974259
Surface Hole Longitude: -112.793896

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-09-07 Obtained License
1951-10-18 Finished Drilling
1951-10-18 Well Mode changed to Drilled and Cased
1951-10-21 Drill Stem Test Performed
1951-10-22 Production Casing Operation Performed
1951-10-24 Perforation Treatment Performed - Jet Perforation
1951-10-26 Well Began Production
1951-10-26 Well Fluid changed to Crude Oil
1951-10-26 Well Mode changed to Flowing
1961-01-25 Perforation Treatment Performed - Acid Wash - No Pressure
1970-03-05 Perforation Treatment Performed - Cement Plug
1975-06-09 Well Fluid changed to Crude Oil
1975-06-09 Well Mode changed to Pumping
1981-02-01 Well Fluid changed to Crude Oil
1981-02-01 Well Mode changed to Suspended
1982-06-08 Perforation Treatment Performed - Jet Perforation
1982-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-08 Well Fluid changed to Crude Oil
1983-02-08 Well Mode changed to Pumping
1988-11-25 Well Log Performed
1989-01-18 Well Fluid changed to Crude Oil
1989-01-18 Well Mode changed to Flowing
1989-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-16 Well Fluid changed to Crude Oil
1990-03-16 Well Mode changed to Pumping
1996-08-30 Well Log Performed
1996-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-31 Perforation Treatment Performed - Jet Perforation
1996-08-31 Plug Back Performed
1996-09-05 Perforation Treatment Performed - Remedial Casing
1996-09-26 Well Abandoned
1996-09-26 Well Fluid changed to Crude Oil
1996-09-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-10-24 Perforation 1588.60 1592.30 13
1961-01-25 Acid Wash 1588.60 1592.30 0
1970-03-05 Cement Plug 1592.60 1609.30 0
1982-06-08 Perforation 1591.10 1603.60 13
1982-08-25 Acid Treatment 1591.10 1603.60 0
1989-03-14 Acid Treatment 1588.60 1603.60 0
1996-08-31 Packing Device Capped w/Cement 1557.00 1565.00 0
1996-08-31 Perforation 400.00 401.00 13
1996-09-05 Remedial Casing Cementing 400.00 401.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5017 0.0 0.0 0.0
1968 6486 0.0 0.0 0.0
1969 7549 0.0 0.0 0.0
1970 7403 0.0 0.0 0.0
1971 8324 0.0 0.0 0.0
1972 8304 0.0 0.0 0.0
1973 7738 0.0 0.0 0.0
1974 5554 0.0 0.0 0.0
1975 7222 0.0 0.0 0.0
1976 8471 0.0 0.0 0.0
1977 8432 0.0 0.0 0.0
1978 8461 0.0 0.0 0.0
1979 8195 0.0 0.0 0.0
1980 360 0.0 0.0 0.0
1983 7219 0.0 0.0 0.0
1984 8379 0.0 0.0 0.0
1985 8626 0.0 0.0 0.0
1986 8728 0.0 0.0 0.0
1987 7915 0.0 0.0 0.0
1988 7973 0.0 0.0 0.0
1989 7497 0.0 0.0 0.0
1990 8552 0.0 0.0 0.0
1991 7751 0.0 0.0 0.0
1992 8540 0.0 0.0 0.0
1993 8291 0.0 0.0 0.0
1994 7088 0.0 0.0 0.0
1995 5564 0.0 0.0 0.0
1996 4447 0.0 0.0 0.0

For data sources see[5]

References