X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354201111020

Well Details

Well ID: 0354201111020
Loading map...
Location: 02/11-11-035-20W4/0
Location Alias: 02/11-11-35-20 W4M
Location Alias 2: 02/11-11-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 11
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH 102 FENNBV 11-11-35-20
Operator Name: Enhance Energy Inc.
License Number: 0093485
License Date: 1981-11-24
License Status: Suspension
Spud Date: 1981-12-05
Final Drill Date: 1981-12-16
Well Total Depth: 1640.00 m
Surface Hole Latitude: 51.992425
Surface Hole Longitude: -112.757100

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-11-24 Obtained License
1981-12-16 Finished Drilling
1981-12-17 Drill Stem Test Performed
1981-12-18 Production Casing Operation Performed
1981-12-19 Well Mode changed to Drilled and Cased
1983-01-20 Perforation Treatment Performed - Jet Perforation
1983-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-02-17 Well Began Injection
1983-02-17 Well Fluid changed to Solvent
1983-02-17 Well Type changed to Injection
1983-03-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-28 Well Log Performed
1983-09-08 Perforation Treatment Performed - Fractured
1983-09-13 Well Log Performed
1984-04-27 Perforation Treatment Performed - Cement Squeeze
1984-05-02 Perforation Treatment Performed - Jet Perforation
1984-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-07 Well Log Performed
1984-11-15 Well Log Performed
1985-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-06 Well Log Performed
1985-08-23 Perforation Treatment Performed - Cement Squeeze
1985-08-23 Well Log Performed
1985-08-26 Well Log Performed
1985-08-27 Perforation Treatment Performed - Fractured
1985-08-27 Perforation Treatment Performed - Jet Perforation
1985-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-29 Perforation Treatment Performed - Jet Perforation
1985-09-04 Perforation Treatment Performed - Fractured
1985-09-24 Well Log Performed
1985-11-06 Well Log Performed
1986-06-24 Well Log Performed
1988-02-22 Well Log Performed
1988-03-07 Well Log Performed
1989-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-19 Well Log Performed
1996-10-20 Perforation Treatment Performed - Jet Perforation
1996-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-11-01 Well Began Production
1996-11-01 Well Fluid changed to Crude Oil
1996-11-01 Well Mode changed to Flowing
1996-12-13 Well Log Performed
1999-06-01 Well Fluid changed to Crude Oil
1999-06-01 Well Mode changed to Suspended
2002-08-27 Well Log Performed
2002-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-10-17 Plug Back Performed
2002-10-17 Well Fluid changed to Crude Oil
2002-10-17 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-01-20 Perforation 1611.70 1622.50 13
1985-08-27 Perforation 1616.50 1622.50 13
1985-08-27 Fracture 1618.90 1622.50 0
1985-08-27 Fracture 1616.50 1620.10 0
1985-08-28 Acid Treatment 1616.50 1622.50 0
1985-08-29 Perforation 1611.70 1614.60 6
1985-08-29 Acid Treatment 1611.70 1614.60 0
1985-08-29 Acid Treatment 1611.70 1614.60 0
1985-09-04 Fracture 1611.70 1622.50 0
1989-01-15 Acid Treatment 1611.70 1622.50 0
1993-01-09 Acid Treatment 1611.70 1622.50 0
1983-01-21 Acid Treatment 1611.70 1622.50 0
1996-10-20 Perforation 1610.50 1611.60 14
1996-10-21 Acid Treatment 1610.50 1612.10 0
2002-10-17 Packing Device Capped w/Cement 1603.00 1611.00 0
1983-03-26 Acid Treatment 1611.70 1622.50 0
1983-09-08 Fracture 1611.70 1622.50 0
1984-04-27 Cement Squeeze 1611.70 1622.50 0
1984-05-02 Perforation 1616.00 1622.50 5
1984-05-04 Acid Treatment 1616.00 1622.50 0
1985-01-31 Acid Treatment 1616.00 1622.50 0
1985-08-23 Cement Squeeze 1616.00 1622.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 819 0.0 0.0 0.0
1997 1360 0.0 0.0 0.0

For data sources see[5]

References