X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354201414000

Well Details

Well ID: 0354201414000
Loading map...
Location: 00/14-14-035-20W4/0
Location Alias: 00/14-14-35-20 W4M
Location Alias 2: 00/14-14-035-20 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 20
Section: 14
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH FENNBV 14-14-35-20
Operator Name: Enhance Energy Inc.
License Number: 0008533
License Date: 1954-09-27
License Status: Issued
Spud Date: 1954-10-01
Final Drill Date: 1954-10-22
Well Total Depth: 1628.40 m
Surface Hole Latitude: 52.010096
Surface Hole Longitude: -112.758076

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-09-27 Obtained License
1954-10-19 Production Casing Operation Performed
1954-10-22 Finished Drilling
1954-10-22 Well Mode changed to Drilled and Cased
1954-10-23 Well Began Production
1954-10-23 Well Fluid changed to Crude Oil
1954-10-23 Well Mode changed to Flowing
1974-05-05 Well Fluid changed to Crude Oil
1974-05-05 Well Mode changed to Pumping
1983-10-07 Perforation Treatment Performed - Open-Hole Completion
1983-10-07 Well Log Performed
1983-10-12 Perforation Treatment Performed - Cement Plug
1983-10-12 Well Log Performed
1983-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-10-13 Perforation Treatment Performed - Jet Perforation
1996-09-21 Well Log Performed
1996-09-22 Perforation Treatment Performed - Jet Perforation
1996-09-27 Perforation Treatment Performed - Cement Squeeze
1996-10-02 Perforation Treatment Performed - Cement Squeeze
1996-10-04 Perforation Treatment Performed - Jet Perforation
1996-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-10-07 Open Hole/Barefoot Completion 1614.50 1628.40 0
1983-10-12 Cement Plug 1613.00 1628.40 0
1983-10-13 Perforation 1608.10 1612.10 13
1983-10-13 Acid Treatment 1608.10 1612.10 0
1996-09-22 Perforation 600.00 600.50 13
1996-09-27 Cement Squeeze 600.00 600.50 0
1996-10-02 Cement Squeeze 1608.10 1612.10 0
1996-10-04 Perforation 1604.70 1607.80 18
1996-10-05 Acid Treatment 1604.70 1607.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2708 0.0 0.0 0.0
1968 2450 0.0 0.0 0.0
1969 3704 0.0 0.0 0.0
1970 4010 0.0 0.0 0.0
1971 4895 0.0 0.0 0.0
1972 6482 0.0 0.0 0.0
1973 7379 0.0 0.0 0.0
1974 5264 0.0 0.0 0.0
1975 7598 0.0 0.0 0.0
1976 7116 0.0 0.0 0.0
1977 7248 0.0 0.0 0.0
1978 6866 0.0 0.0 0.0
1979 8567 0.0 0.0 0.0
1980 7093 0.0 0.0 0.0
1981 7448 0.0 0.0 0.0
1982 7940 0.0 0.0 0.0
1983 8297 0.0 0.0 0.0
1984 8424 0.0 0.0 0.0
1985 8694 0.0 0.0 0.0
1986 8476 0.0 0.0 0.0
1987 8320 0.0 0.0 0.0
1988 8742 0.0 0.0 0.0
1989 8470 0.0 0.0 0.0
1990 8638 0.0 0.0 0.0
1991 8320 0.0 0.0 0.0
1992 8484 0.0 0.0 0.0
1993 8590 0.0 0.0 0.0
1994 8714 0.0 0.0 0.0
1995 8525 0.0 0.0 0.0
1996 8270 0.0 0.0 0.0
1997 8539 0.0 0.0 0.0
1998 8491 0.0 0.0 0.0
1999 5991 0.0 0.0 0.0
2000 8185 0.0 0.0 0.0
2001 8552 0.0 0.0 0.0
2002 7854 0.0 0.0 0.0
2005 1494 0.0 0.0 0.0
2006 8025 0.0 0.0 0.0
2007 8050 0.0 0.0 0.0
2008 7321 0.0 0.0 0.0
2009 8228 0.0 0.0 0.0
2010 8401 0.0 0.0 0.0
2011 6634 0.0 0.0 0.0
2012 7959 0.0 0.0 0.0
2013 4970 0.0 0.0 0.0
2014 8476 0.0 0.0 0.0
2015 7716 0.0 0.0 0.0
2017 5028 0.0 0.0 0.0
2018 8549 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References