X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354221715020

Well Details

Well ID: 0354221715020
Loading map...
Location: 02/15-17-035-22W4/0
Location Alias: 02/15-17-35-22 W4M
Location Alias 2: 02/15-17-035-22 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 22
Section: 17
County/Municipality: Red Deer County
Well Name: WHITECAP ELNORA 15-17-35-22
Operator Name: Whitecap Resources Inc.
License Number: 0450962
License Date: 2012-11-28
License Status: Issued
Spud Date: 2013-03-04
Final Drill Date: 2013-03-09
Well Total Depth: 1956.00 m
Surface Hole Latitude: 52.009999
Surface Hole Longitude: -113.109716

For data sources see[1][2]

Well History

Date Event
2012-11-28 Obtained License
2013-03-06 Surface Casing Operation Performed
2013-03-07 Direction Drilling Operation Performed - Deviate
2013-03-09 Finished Drilling
2013-03-09 Well Mode changed to Drilled and Cased
2013-03-10 Production Casing Operation Performed
2013-03-10 Well Log Performed
2013-03-11 Rig Released
2013-03-18 Perforation Treatment Performed - Jet Perforation
2013-04-25 Well Began Production
2013-04-25 Well Fluid changed to Crude Oil
2013-04-25 Well Mode changed to Pumping
2016-11-14 Perforation Treatment Performed - Jet Perforation
2016-11-14 Well Log Performed
2016-11-25 Perforation Treatment Performed - Chemical Squeeze
2016-12-03 Perforation Treatment Performed - Chemical Squeeze
2018-08-01 Well Log Performed
2018-09-25 Well Type changed to Observation
2018-10-01 Well Fluid changed to Crude Oil
2018-10-01 Well Mode changed to Pumping
2018-11-01 Well Type changed to Observation

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-03-04 Chinook Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-03-07 1390.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-18 Perforation 1900.50 1901.50 20
2013-03-18 Perforation 1897.00 1899.00 20
2016-11-14 Perforation 1897.00 1899.00 20
2016-11-14 Perforation 1900.50 1902.50 20
2016-11-25 Chemical Squeeze 1897.00 1902.50 0
2016-12-03 Chemical Squeeze 1897.00 1902.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 3295 0.0 0.0 0.0
2014 2959 0.0 0.0 0.0
2015 8052 0.0 0.0 0.0
2016 7975 0.0 0.0 0.0
2017 5928 0.0 0.0 0.0
2018 15 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-11 No Incident Encountered 0.00 0.00
2013-03-28 No Incident Encountered 0.00 0.00
2016-11-14 No Incident Encountered 0.00 0.00

For data sources see[8]

References