X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354222010000

Well Details

Well ID: 0354222010000
Loading map...
Location: 00/10-20-035-22W4/0
Location Alias: 00/10-20-35-22 W4M
Location Alias 2: 00/10-20-035-22 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 22
Section: 20
County/Municipality: Red Deer County
Well Name: EMBER ELNORA 10-20-35-22
Operator Name: Ember Resources Inc.
License Number: 0351443
License Date: 2006-02-07
License Status: Issued
Spud Date: 2006-02-26
Final Drill Date: 2006-02-28
Well Total Depth: 517.60 m
Surface Hole Latitude: 52.020774
Surface Hole Longitude: -113.111454

For data sources see[1][2]

Well History

Date Event
2006-02-07 Obtained License
2006-02-26 Surface Casing Operation Performed
2006-02-28 Finished Drilling
2006-02-28 Production Casing Operation Performed
2006-02-28 Rig Released
2006-02-28 Well Mode changed to Drilled and Cased
2006-03-10 Well Log Performed
2006-03-15 Perforation Treatment Performed - Jet Perforation
2006-03-15 Well Log Performed
2006-03-23 Perforation Treatment Performed - Fractured
2006-04-13 Well Began Production
2006-04-13 Well Fluid changed to Coalbed Methane-Coals and Other
2006-04-13 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-15 Perforation 489.60 489.90 17
2006-03-15 Perforation 414.60 415.20 17
2006-03-15 Perforation 413.00 414.00 17
2006-03-15 Perforation 411.70 412.20 17
2006-03-15 Perforation 393.60 393.90 17
2006-03-15 Perforation 391.00 392.50 17
2006-03-15 Perforation 383.90 384.40 17
2006-03-15 Perforation 379.60 380.00 17
2006-03-15 Perforation 373.80 374.10 17
2006-03-15 Perforation 369.00 372.00 17
2006-03-15 Perforation 306.70 307.70 17
2006-03-15 Perforation 484.30 484.60 17
2006-03-15 Perforation 300.00 302.00 17
2006-03-15 Perforation 293.00 294.00 17
2006-03-23 Fracture 293.00 489.90 0
2006-03-15 Perforation 472.40 473.40 17
2006-03-15 Perforation 469.40 469.80 17
2006-03-15 Perforation 467.10 467.70 17
2006-03-15 Perforation 454.40 454.90 17
2006-03-15 Perforation 445.80 446.50 17
2006-03-15 Perforation 429.80 430.50 17
2006-03-15 Perforation 418.10 418.60 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 6010 0.0 0.0 0.0
2007 8634 0.0 0.0 0.0
2008 8729 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8577 0.0 0.0 0.0
2011 8655 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8723 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 4233 0.0 0.0 0.0
2020 1698 0.0 0.0 0.0

For data sources see[5]

References