X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354222315020

Well Details

Well ID: 0354222315020
Loading map...
Location: 02/15-23-035-22W4/0
Location Alias: 02/15-23-35-22 W4M
Location Alias 2: 02/15-23-035-22 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 22
Section: 23
County/Municipality: Red Deer County
Well Name: EMBER 102 ELNORA 15-23-35-22
Operator Name: Ember Resources Inc.
License Number: 0432533
License Date: 2011-03-23
License Status: Amended
Spud Date: 2012-01-31
Final Drill Date: 2012-02-01
Well Total Depth: 1015.00 m
Surface Hole Latitude: 52.027519
Surface Hole Longitude: -113.039547

For data sources see[1][2]

Well History

Date Event
2011-03-23 Obtained License
2012-01-31 Direction Drilling Operation Performed - Deviate
2012-01-31 Surface Casing Operation Performed
2012-02-01 Finished Drilling
2012-02-01 Production Casing Operation Performed
2012-02-01 Well Mode changed to Drilled and Cased
2012-02-02 Rig Released
2012-02-15 Well Log Performed
2012-02-24 Perforation Treatment Performed - Jet Perforation
2012-02-27 Perforation Treatment Performed - Fractured
2012-03-05 Well Began Production
2012-03-05 Well Fluid changed to Coalbed Methane-Coals and Other
2012-03-05 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-01-31 Precision Drilling Corporation 239 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-01-31 0.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-24 Perforation 310.50 313.50 13
2012-02-24 Perforation 522.30 524.80 13
2012-02-24 Perforation 528.80 529.30 13
2012-02-24 Perforation 532.20 534.70 13
2012-02-24 Perforation 537.50 538.00 13
2012-02-24 Perforation 554.10 554.60 13
2012-02-24 Perforation 555.90 557.90 13
2012-02-24 Perforation 558.60 560.60 13
2012-02-24 Perforation 568.40 570.40 13
2012-02-24 Perforation 595.20 596.20 13
2012-02-24 Perforation 609.70 610.20 13
2012-02-24 Perforation 344.20 344.70 13
2012-02-24 Perforation 614.70 616.20 13
2012-02-24 Perforation 627.10 627.60 13
2012-02-24 Perforation 631.90 632.40 13
2012-02-24 Perforation 660.80 661.30 13
2012-02-24 Perforation 703.00 704.00 13
2012-02-24 Perforation 923.00 923.50 13
2012-02-24 Perforation 937.70 938.20 13
2012-02-24 Perforation 939.20 940.20 13
2012-02-27 Fracture 310.50 940.20 0
2012-02-24 Perforation 356.70 357.20 13
2012-02-24 Perforation 385.10 385.60 13
2012-02-24 Perforation 447.20 448.20 13
2012-02-24 Perforation 474.00 474.50 13
2012-02-24 Perforation 499.10 500.10 13
2012-02-24 Perforation 511.20 513.20 13
2012-02-24 Perforation 516.00 516.50 13

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7149 0.0 0.0 0.0
2013 8682 0.0 0.0 0.0
2014 8652 0.0 0.0 0.0
2015 8715 0.0 0.0 0.0
2016 8677 0.0 0.0 0.0
2017 8695 0.0 0.0 0.0
2018 8564 0.0 0.0 0.0
2019 8278 0.0 0.0 0.0
2020 2168 0.0 0.0 0.0

For data sources see[7]

References