X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354251413000

Well Details

Well ID: 0354251413000
Loading map...
Location: 00/13-14-035-25W4/0
Location Alias: 00/13-14-35-25 W4M
Location Alias 2: 00/13-14-035-25 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 25
Section: 14
County/Municipality: Red Deer County
Well Name: HUSKY-PHILLIPS-PINE LAKE NO.1
Operator Name: Husky Oil Operations Limited
License Number: 0002841
License Date: 1951-05-04
License Status: Re-Entered
Spud Date: 1951-05-15
Final Drill Date: 1951-09-15
Well Total Depth: 2457.30 m
Surface Hole Latitude: 52.010186
Surface Hole Longitude: -113.477829

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-05-04 Obtained License
1951-05-31 Drill Stem Test Performed
1951-06-15 Drill Stem Test Performed
1951-06-23 Drill Stem Test Performed
1951-07-01 Lost Circulation Occurred
1951-07-04 Drill Stem Test Performed
1951-07-20 Drill Stem Test Performed
1951-07-23 Drill Stem Test Performed
1951-07-25 Drill Stem Test Performed
1951-09-13 Drill Stem Test Performed
1951-09-15 Drill Stem Test Performed
1951-09-15 Finished Drilling
1951-09-15 Well Mode changed to Drilled and Cased
1951-09-16 Drill Stem Test Performed
1951-09-18 Drill Stem Test Performed
1951-09-20 Production Casing Operation Performed
1951-09-24 Perforation Treatment Performed - Bullet Perforation
1951-10-02 Perforation Treatment Performed - Cement Squeeze
1951-10-03 Perforation Treatment Performed - Bullet Perforation
1951-10-04 Perforation Treatment Performed - Jet Perforation
1951-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-10-06 Perforation Treatment Performed - Jet Perforation
1951-10-07 Perforation Treatment Performed - Jet Perforation
1951-11-12 Well Began Production
1951-11-12 Well Fluid changed to Crude Oil
1951-11-12 Well Mode changed to Pumping
1954-06-01 Well Fluid changed to Crude Oil
1954-06-01 Well Mode changed to Suspended
1958-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-09-08 Well Fluid changed to Crude Oil
1958-09-08 Well Mode changed to Abandoned and Re-entered
1999-03-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-09-24 Bullet Perforation 2148.20 2150.10 13
1951-10-02 Cement Squeeze 2148.20 2150.10 0
1951-10-03 Bullet Perforation 2144.30 2147.30 23
1951-10-04 Perforation 2145.50 2148.50 13
1951-10-05 Acid Treatment 2144.30 2148.50 0
1951-10-06 Perforation 2145.80 2148.80 13
1951-10-06 Acid Treatment 2144.30 2148.80 0
1951-10-07 Perforation 2147.60 2150.10 16
1958-09-07 Packing Device Capped w/Cement 2128.70 2128.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1951-07-01 Lost Circulation 1556.00 1620.00

For data sources see[6]

References