X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0354262106000

Well Details

Well ID: 0354262106000
Loading map...
Location: 00/06-21-035-26W4/0
Location Alias: 00/06-21-35-26 W4M
Location Alias 2: 00/06-21-035-26 W4/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 4
Range: 26
Section: 21
County/Municipality: Red Deer County
Well Name: Vantage WIM 6-21-35-26
Operator Name: Vantage Point Resources Inc.
License Number: 0111449
License Date: 1984-12-06
License Status: Issued
Spud Date: 1984-12-07
Final Drill Date: 1984-12-13
Well Total Depth: 1895.00 m
Surface Hole Latitude: 52.018420
Surface Hole Longitude: -113.663005

For data sources see[1][2]

Well History

Date Event
1984-12-06 Obtained License
1984-12-08 Surface Casing Operation Performed
1984-12-13 Finished Drilling
1984-12-13 Well Mode changed to Drilled and Cased
1984-12-14 Well Log Performed
1984-12-15 Drill Stem Test Performed
1984-12-16 Drill Stem Test Performed
1984-12-18 Drill Stem Test Performed
1984-12-19 Drill Stem Test Performed
1984-12-20 Drill Stem Test Performed
1984-12-21 Production Casing Operation Performed
1984-12-22 Rig Released
1985-01-14 Well Log Performed
1985-01-16 Perforation Treatment Performed - Jet Perforation
1985-01-16 Well Log Performed
1985-01-18 Perforation Treatment Performed - Fractured
1985-02-11 Well Began Production
1985-02-11 Well Fluid changed to Crude Oil
1985-02-11 Well Mode changed to Pumping
1985-05-17 Well Fluid changed to Crude Oil
1985-05-17 Well Mode changed to Suspended
1985-07-30 Perforation Treatment Performed - Casing Patch (Over Perfs)
1985-08-01 Perforation Treatment Performed - Casing Patch (Over Perfs)
1985-08-01 Well Fluid changed to Crude Oil
1985-08-01 Well Mode changed to Abandoned Zone
1985-08-03 Perforation Treatment Performed - Jet Perforation
1985-08-03 Well Log Performed
1987-11-05 Perforation Treatment Performed - Jet Perforation
1987-11-05 Well Log Performed
1987-11-11 Perforation Treatment Performed - Fractured
1987-12-02 Well Log Performed
1987-12-09 Well Log Performed
1988-12-09 Perforation Treatment Performed - Jet Perforation
1988-12-09 Well Log Performed
1989-01-30 Perforation Treatment Performed - Fractured
1997-07-25 Well Log Performed
2013-08-27 Perforation Treatment Performed - Cement Squeeze
2013-08-27 Plug Back Performed
2013-09-07 Perforation Treatment Performed - Jet Perforation
2013-09-11 Well Log Performed
2013-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-09-15 Perforation Treatment Performed - Jet Perforation
2013-09-20 Perforation Treatment Performed - Fractured
2013-09-24 Perforation Treatment Performed - Jet Perforation
2013-09-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-01-16 Perforation 1626.50 1627.50 13
1987-11-05 Perforation 1055.50 1057.50 7
1987-11-05 Perforation 1061.00 1063.50 7
1987-11-11 Fracture 1052.50 1063.50 0
1988-12-09 Perforation 1836.00 1838.50 13
1989-01-30 Fracture 1836.00 1838.50 0
2013-08-27 Cement Squeeze 1052.50 1063.80 0
2013-09-07 Perforation 1620.50 1622.00 13
2013-09-07 Perforation 1626.50 1627.50 13
2013-09-07 Perforation 1622.50 1623.50 13
2013-09-12 Packing Device Capped w/Cement 1620.50 1627.50 0
1985-01-16 Perforation 1620.50 1622.00 13
2013-09-15 Perforation 1823.50 1829.00 20
2013-09-20 Fracture 1823.50 1838.50 0
2013-09-24 Perforation 1835.50 1838.50 17
1985-01-16 Perforation 1622.50 1623.50 13
1985-01-18 Fracture 1620.50 1627.50 0
1985-07-30 Casing Patch 1619.00 1625.00 0
1985-08-01 Casing Patch 1626.50 1627.50 0
1985-08-01 Casing Patch 1625.80 1628.90 0
1985-08-03 Perforation 1836.00 1838.50 13
1987-11-05 Perforation 1052.50 1053.50 7

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-20 2013-09-20 0 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 47.1944 N/A
ClearFRAC XT; N002 Schlumberger Crystalline silica 14808-60-7 100 24.331 N/A
ClearFRAC XT; N002 Schlumberger Energizing Fluid Acetic acid ethenyl ester; polymer with ethenol 25213-24-5 100 0.0039 N/A
Benzenesulfonic acid; 4-ethenyl-; sodium salt; homopolymer 25704-18-1 100 0.0419 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.3354 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0005 N/A
Nitrogen; liquid form 7727-37-9 100 27.7714 N/A
Polyvinyl acetate; partially hydrolyzed 304443-60-5 100 0.0009 N/A
Propan-2-ol 67-63-0 100 0.2531 N/A
Sodium chloride 7647-14-5 100 0.046 N/A
Sodium chloroacetate 3926-62-3 100 0.0043 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0175 N/A

For data sources see[5]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-08-23 2013-09-27 Central Water Distribution Facility 14

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 1710 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-27 No Incident Encountered 0.00 0.00

For data sources see[8]

References