If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0354263316000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.054339,"lon":-113.653521,"icon":""}]} |
| Location: 00/16-33-035-26W4/0 | |
| Location Alias: 00/16-33-35-26 W4M | |
| Location Alias 2: 00/16-33-035-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 33 | |
| County/Municipality: Red Deer County | |
| Well Name: CPC RESOURCES THREEHCK 16-33-35-26 | |
| Operator Name: Lynx Energy ULC | |
| License Number: 0377791 | |
| License Date: 2007-06-05 | |
| License Status: Issued | |
| Spud Date: 2007-09-15 | |
| Final Drill Date: 2007-09-22 | |
| Well Total Depth: 1164.00 m | |
| Surface Hole Latitude: 52.054339 | |
| Surface Hole Longitude: -113.653521 |
| Date | Event |
|---|---|
| 2007-06-05 | Obtained License |
| 2007-09-16 | Surface Casing Operation Performed |
| 2007-09-17 | Direction Drilling Operation Performed - Deviate |
| 2007-09-22 | Finished Drilling |
| 2007-09-22 | Production Casing Operation Performed |
| 2007-09-22 | Rig Released |
| 2007-09-22 | Well Mode changed to Drilled and Cased |
| 2007-09-28 | Well Log Performed |
| 2007-10-05 | Well Log Performed |
| 2007-10-17 | Perforation Treatment Performed - Jet Perforation |
| 2007-10-31 | Perforation Treatment Performed - Jet Perforation |
| 2007-11-23 | Perforation Treatment Performed - Jet Perforation |
| 2007-12-06 | Perforation Treatment Performed - Fractured |
| 2007-12-15 | Perforation Treatment Performed - Jet Perforation |
| 2007-12-17 | Perforation Treatment Performed - Fractured |
| 2007-12-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2007-12-19 | Well Mode changed to Testing |
| 2008-07-24 | Well Began Production |
| 2008-07-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2008-07-24 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2007-09-17 | 227.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2007-10-17 | Perforation | 1143.40 | 1146.40 | 13 |
| 2007-11-23 | Perforation | 772.80 | 773.80 | 7 |
| 2007-11-23 | Perforation | 783.40 | 784.40 | 7 |
| 2007-12-06 | Fracture | 744.70 | 784.40 | 0 |
| 2007-12-15 | Perforation | 733.90 | 735.40 | 7 |
| 2007-12-15 | Perforation | 723.50 | 724.50 | 7 |
| 2007-12-15 | Perforation | 714.00 | 715.50 | 7 |
| 2007-12-15 | Perforation | 706.40 | 707.40 | 7 |
| 2007-12-15 | Perforation | 693.20 | 694.20 | 7 |
| 2007-12-15 | Perforation | 686.40 | 687.40 | 7 |
| 2007-12-15 | Perforation | 664.60 | 665.60 | 7 |
| 2007-10-17 | Perforation | 1119.70 | 1120.70 | 13 |
| 2007-12-15 | Perforation | 634.70 | 635.70 | 7 |
| 2007-12-15 | Perforation | 625.90 | 626.90 | 7 |
| 2007-12-15 | Perforation | 614.30 | 617.80 | 7 |
| 2007-12-15 | Perforation | 611.00 | 613.00 | 7 |
| 2007-12-15 | Perforation | 609.00 | 611.00 | 7 |
| 2007-12-15 | Perforation | 533.00 | 535.00 | 7 |
| 2007-12-15 | Perforation | 505.00 | 506.00 | 7 |
| 2007-12-17 | Fracture | 505.00 | 735.40 | 0 |
| 2007-10-31 | Perforation | 1084.00 | 1085.00 | 13 |
| 2007-11-23 | Perforation | 744.70 | 746.70 | 7 |
| 2007-11-23 | Perforation | 753.50 | 755.00 | 7 |
| 2007-11-23 | Perforation | 757.40 | 758.40 | 7 |
| 2007-11-23 | Perforation | 759.00 | 760.00 | 7 |
| 2007-11-23 | Perforation | 761.30 | 762.30 | 7 |
| 2007-11-23 | Perforation | 769.00 | 770.00 | 7 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2008 | 3936 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8759 | 0.0 | 0.0 | 0.0 |
| 2012 | 8779 | 0.0 | 0.0 | 0.0 |
| 2013 | 6539 | 0.0 | 0.0 | 0.0 |
| 2014 | 5099 | 0.0 | 0.0 | 0.0 |
| 2015 | 8718 | 0.0 | 0.0 | 0.0 |
| 2016 | 8759 | 0.0 | 0.0 | 0.0 |
| 2017 | 8736 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]