X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355012112000

Well Details

Well ID: 0355012112000
Loading map...
Location: 00/12-21-035-01W5/0
Location Alias: 00/12-21-35-01 W5M
Location Alias 2: 00/12-21-035-01 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 01
Section: 21
County/Municipality: Red Deer County
Well Name: CLEARBROOK INNIS 12-21-35-1
Operator Name: Enhance Energy Inc.
License Number: 0016827
License Date: 1959-03-10
License Status: Suspension
Spud Date: 1959-03-13
Final Drill Date: 1959-04-17
Well Total Depth: 2596.00 m
Surface Hole Latitude: 52.022541
Surface Hole Longitude: -114.093149

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-03-10 Obtained License
1959-04-17 Finished Drilling
1959-04-17 Well Mode changed to Drilled and Cased
1959-04-18 Production Casing Operation Performed
1959-04-21 Perforation Treatment Performed - Jet Perforation
1959-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-04-22 Perforation Treatment Performed - Acid Wash - No Pressure
1959-04-22 Well Began Production
1959-04-22 Well Fluid changed to Crude Oil
1959-04-22 Well Mode changed to Flowing
1988-03-26 Perforation Treatment Performed - Cement Squeeze
1988-03-30 Perforation Treatment Performed - Cement Plug
1988-04-04 Perforation Treatment Performed - Jet Perforation
1988-04-06 Perforation Treatment Performed - Jet Perforation
1988-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-16 Well Fluid changed to Crude Oil
1990-07-16 Well Mode changed to Pumping
1999-10-31 Well Fluid changed to Crude Oil
1999-10-31 Well Mode changed to Suspended
2004-04-17 Well Fluid changed to Crude Oil
2004-04-17 Well Mode changed to Pumping
2006-11-06 Well Fluid changed to Crude Oil
2006-11-06 Well Mode changed to Suspended
2010-03-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-04-21 Perforation 2579.50 2585.60 13
1959-04-22 Acid Wash 2579.50 2585.60 0
1959-04-22 Acid Treatment 2579.50 2585.60 0
1988-03-26 Cement Squeeze 2579.50 2585.60 0
1988-03-30 Cement Plug 2581.70 2585.20 0
1988-04-04 Perforation 2576.80 2576.80 1
1988-04-06 Perforation 2575.60 2577.60 13
1988-04-07 Acid Treatment 2575.60 2577.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1985 3476 0.0 0.0 0.0
1986 7949 0.0 0.0 0.0
1987 5965 0.0 0.0 0.0
1988 922 0.0 0.0 0.0
1989 5149 0.0 0.0 0.0
1990 3931 0.0 0.0 0.0
1991 5777 0.0 0.0 0.0
1992 4928 0.0 0.0 0.0
1993 6945 0.0 0.0 0.0
1994 7502 0.0 0.0 0.0
1995 7755 0.0 0.0 0.0
1996 6146 0.0 0.0 0.0
1997 3119 0.0 0.0 0.0
1999 240 0.0 0.0 0.0
2004 3782 0.0 0.0 0.0
2005 2084 0.0 0.0 0.0

For data sources see[5]

References