If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0355030314000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.970377,"lon":-114.349431,"icon":""}]} |
| Location: 00/14-03-035-03W5/0 | |
| Location Alias: 00/14-03-35-03 W5M | |
| Location Alias 2: 00/14-03-035-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 035 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 03 | |
| County/Municipality: Red Deer County | |
| Well Name: CPEC GARR 14-3-35-3 | |
| Operator Name: Crescent Point Energy Corp. | |
| License Number: 0418968 | |
| License Date: 2010-03-01 | |
| License Status: Amended | |
| Spud Date: 2010-03-05 | |
| Final Drill Date: 2010-03-19 | |
| Well Total Depth: 3227.00 m | |
| Surface Hole Latitude: 51.970377 | |
| Surface Hole Longitude: -114.349431 |
| Date | Event |
|---|---|
| 2010-03-01 | Obtained License |
| 2010-03-06 | Surface Casing Operation Performed |
| 2010-03-10 | Direction Drilling Operation Performed - Horizontal |
| 2010-03-15 | Intermediate Casing Operation Performed |
| 2010-03-19 | Finished Drilling |
| 2010-03-19 | Well Log Performed |
| 2010-03-19 | Well Mode changed to Drilled and Cased |
| 2010-03-21 | Liner Casing Operation Performed |
| 2010-03-22 | Rig Released |
| 2010-03-24 | Perforation Treatment Performed - Open-Hole Completion |
| 2010-03-24 | Well Log Performed |
| 2010-03-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2010-04-07 | Well Began Production |
| 2010-04-07 | Well Fluid changed to Crude Oil |
| 2010-04-07 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-03-10 | 1453.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-03-24 | Open Hole/Barefoot Completion | 2040.00 | 3220.00 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 2867.50 | 2868.40 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 2969.50 | 2970.40 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 3072.70 | 3073.60 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 3175.90 | 3176.70 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 2105.00 | 2105.90 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 2196.00 | 2196.90 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 2287.10 | 2288.00 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 2377.30 | 2378.20 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 2467.90 | 2468.80 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 2559.10 | 2560.00 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 2661.60 | 2662.50 | 0 |
| 2010-03-26 | Multi-Stage Fracture | 2765.00 | 2765.90 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 6063 | 0.0 | 0.0 | 0.0 |
| 2011 | 8526 | 0.0 | 0.0 | 0.0 |
| 2012 | 8519 | 0.0 | 0.0 | 0.0 |
| 2013 | 8359 | 0.0 | 0.0 | 0.0 |
| 2014 | 8579 | 0.0 | 0.0 | 0.0 |
| 2015 | 8639 | 0.0 | 0.0 | 0.0 |
| 2016 | 8699 | 0.0 | 0.0 | 0.0 |
| 2017 | 8615 | 0.0 | 0.0 | 0.0 |
| 2018 | 8663 | 0.0 | 0.0 | 0.0 |
| 2019 | 8663 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]