X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355030314000

Well Details

Well ID: 0355030314000
Loading map...
Location: 00/14-03-035-03W5/0
Location Alias: 00/14-03-35-03 W5M
Location Alias 2: 00/14-03-035-03 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 03
Section: 03
County/Municipality: Red Deer County
Well Name: CPEC GARR 14-3-35-3
Operator Name: Crescent Point Energy Corp.
License Number: 0418968
License Date: 2010-03-01
License Status: Amended
Spud Date: 2010-03-05
Final Drill Date: 2010-03-19
Well Total Depth: 3227.00 m
Surface Hole Latitude: 51.970377
Surface Hole Longitude: -114.349431

For data sources see[1][2]

Well History

Date Event
2010-03-01 Obtained License
2010-03-06 Surface Casing Operation Performed
2010-03-10 Direction Drilling Operation Performed - Horizontal
2010-03-15 Intermediate Casing Operation Performed
2010-03-19 Finished Drilling
2010-03-19 Well Log Performed
2010-03-19 Well Mode changed to Drilled and Cased
2010-03-21 Liner Casing Operation Performed
2010-03-22 Rig Released
2010-03-24 Perforation Treatment Performed - Open-Hole Completion
2010-03-24 Well Log Performed
2010-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-07 Well Began Production
2010-04-07 Well Fluid changed to Crude Oil
2010-04-07 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-10 1453.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-24 Open Hole/Barefoot Completion 2040.00 3220.00 0
2010-03-26 Multi-Stage Fracture 2867.50 2868.40 0
2010-03-26 Multi-Stage Fracture 2969.50 2970.40 0
2010-03-26 Multi-Stage Fracture 3072.70 3073.60 0
2010-03-26 Multi-Stage Fracture 3175.90 3176.70 0
2010-03-26 Multi-Stage Fracture 2105.00 2105.90 0
2010-03-26 Multi-Stage Fracture 2196.00 2196.90 0
2010-03-26 Multi-Stage Fracture 2287.10 2288.00 0
2010-03-26 Multi-Stage Fracture 2377.30 2378.20 0
2010-03-26 Multi-Stage Fracture 2467.90 2468.80 0
2010-03-26 Multi-Stage Fracture 2559.10 2560.00 0
2010-03-26 Multi-Stage Fracture 2661.60 2662.50 0
2010-03-26 Multi-Stage Fracture 2765.00 2765.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6063 0.0 0.0 0.0
2011 8526 0.0 0.0 0.0
2012 8519 0.0 0.0 0.0
2013 8359 0.0 0.0 0.0
2014 8579 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8699 0.0 0.0 0.0
2017 8615 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 8663 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References