X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355033111000

Well Details

Well ID: 0355033111000
Loading map...
Location: 00/11-31-035-03W5/0
Location Alias: 00/11-31-35-03 W5M
Location Alias 2: 00/11-31-035-03 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 03
Section: 31
County/Municipality: Red Deer County
Well Name: CVE GARR 11-31-35-3
Operator Name: Cenovus Energy Inc.
License Number: 0117556
License Date: 1985-09-10
License Status: Suspension
Spud Date: 1985-09-21
Final Drill Date: 1985-10-31
Well Total Depth: 3091.00 m
Surface Hole Latitude: 52.050298
Surface Hole Longitude: -114.421747

For data sources see[1][2]

Well History

Date Event
1985-09-10 Obtained License
1985-09-23 Surface Casing Operation Performed
1985-10-11 Well Log Performed
1985-10-12 Well Log Performed
1985-10-13 Intermediate Casing Operation Performed
1985-10-14 Well Log Performed
1985-10-28 Well Log Performed
1985-10-30 Well Log Performed
1985-10-31 Finished Drilling
1985-11-01 Well Log Performed
1985-11-02 Liner Casing Operation Performed
1985-11-04 Rig Released
1985-12-18 Perforation Treatment Performed - Jet Perforation
1985-12-18 Well Log Performed
1985-12-20 Well Mode changed to Drilled and Cased
1986-11-22 Perforation Treatment Performed - Cement Squeeze
1986-11-26 Well Log Performed
1986-11-27 Perforation Treatment Performed - Jet Perforation
1986-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-06 Well Began Production
1986-12-06 Well Fluid changed to Crude Oil
1986-12-06 Well Mode changed to Flowing
1987-02-10 Well Log Performed
1990-06-20 Well Log Performed
1990-06-21 Well Log Performed
1990-10-12 Perforation Treatment Performed - Jet Perforation
1990-10-17 Perforation Treatment Performed - Jet Perforation
1990-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-03 Perforation Treatment Performed - Cement Squeeze
1991-08-09 Well Log Performed
1991-08-10 Perforation Treatment Performed - Jet Perforation
1991-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-22 Perforation Treatment Performed - Cement Squeeze
1991-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-23 Perforation Treatment Performed - Jet Perforation
1992-06-01 Well Log Performed
1992-06-03 Perforation Treatment Performed - Cement Squeeze
1992-06-03 Perforation Treatment Performed - Jet Perforation
1992-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-30 Well Fluid changed to Gas
1992-06-30 Well Mode changed to Flowing
1994-04-28 Well Log Performed
1995-10-12 Well Log Performed
1995-11-01 Well Log Performed
2009-01-14 Well Fluid changed to Gas
2009-01-14 Well Mode changed to Pumping
2018-06-01 Well Fluid changed to Gas
2018-06-01 Well Mode changed to Suspended
2020-03-05 Perforation Treatment Performed - Cement Plug
2020-03-05 Plug Back Performed
2020-03-05 Well Fluid changed to Gas
2020-03-05 Well Mode changed to Abandoned Zone
2020-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-06 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-18 Perforation 2979.00 2985.00 13
1991-08-03 Cement Squeeze 2993.00 2995.50 0
1991-08-10 Perforation 2994.00 2998.00 14
1991-08-13 Acid Treatment 2994.00 2998.00 0
1991-08-22 Cement Squeeze 2994.00 2998.00 0
1991-08-23 Perforation 2987.00 2991.00 13
1991-08-23 Acid Treatment 2987.00 2991.00 0
1992-06-03 Cement Squeeze 2987.00 2991.00 0
1992-06-03 Perforation 2935.50 2937.50 13
1992-06-03 Perforation 2939.50 2945.50 13
1992-06-03 Perforation 2958.50 2962.20 13
1986-11-22 Cement Squeeze 2979.00 2985.00 0
1992-06-04 Acid Treatment 2935.50 2962.20 0
2020-03-05 Cement Plug 2828.20 2925.00 0
2020-03-06 Packing Device Capped w/Cement 2487.00 2495.00 0
1986-11-27 Perforation 3002.50 3005.50 13
1986-11-28 Acid Treatment 3002.50 3005.50 0
1990-10-12 Perforation 3013.00 3015.00 14
1990-10-17 Perforation 2993.00 2995.50 13
1990-10-17 Perforation 2999.00 3000.50 13
1990-10-18 Acid Treatment 2993.00 2995.50 0
1990-10-19 Acid Treatment 2993.00 3005.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 34 0.0 0.0 0.0
1986 545 0.0 0.0 0.0
1987 3548 0.0 0.0 0.0
1988 5734 0.0 0.0 0.0
1989 7430 0.0 0.0 0.0
1990 6085 0.0 0.0 0.0
1992 3800 0.0 0.0 0.0
1993 7922 0.0 0.0 0.0
1994 7502 0.0 0.0 0.0
1995 7300 0.0 0.0 0.0
1996 6553 0.0 0.0 0.0
1997 8371 0.0 0.0 0.0
1998 7035 0.0 0.0 0.0
1999 8573 0.0 0.0 0.0
2000 8229 0.0 0.0 0.0
2001 8545 0.0 0.0 0.0
2002 8124 0.0 0.0 0.0
2003 6469 0.0 0.0 0.0
2004 8308 0.0 0.0 0.0
2005 8518 0.0 0.0 0.0
2006 8087 0.0 0.0 0.0
2007 8572 0.0 0.0 0.0
2008 8300 0.0 0.0 0.0
2009 8160 0.0 0.0 0.0
2010 8154 0.0 0.0 0.0
2011 8661 0.0 0.0 0.0
2012 8639 0.0 0.0 0.0
2013 7867 0.0 0.0 0.0
2014 7438 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8756 0.0 0.0 0.0
2018 2159 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1995-10-13 No Incident Encountered 0.00 0.00
2020-03-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References