X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355052213000

Well Details

Well ID: 0355052213000
Loading map...
Location: 00/13-22-035-05W5/0
Location Alias: 00/13-22-35-05 W5M
Location Alias 2: 00/13-22-035-05 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 05
Section: 22
County/Municipality: Clearwater County
Well Name: RIDGEBACK GARR 13-22-35-5
Operator Name: Ridgeback Resources Inc.
License Number: 0435085
License Date: 2011-07-12
License Status: Issued
Spud Date: 2011-08-21
Final Drill Date: 2011-09-09
Well Total Depth: 3721.00 m
Surface Hole Latitude: 52.025439
Surface Hole Longitude: -114.618671

For data sources see[1][2]

Well History

Date Event
2011-07-12 Obtained License
2011-08-23 Surface Casing Operation Performed
2011-08-28 Direction Drilling Operation Performed - Horizontal
2011-09-02 Intermediate Casing Operation Performed
2011-09-09 Finished Drilling
2011-09-09 Well Log Performed
2011-09-09 Well Mode changed to Drilled and Cased
2011-09-11 Production Casing Operation Performed
2011-09-12 Perforation Treatment Performed - Open-Hole Completion
2011-09-12 Rig Released
2011-09-17 Well Log Performed
2011-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-11 Well Began Production
2011-10-11 Well Fluid changed to Crude Oil
2011-10-11 Well Mode changed to Flowing
2011-10-14 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-28 1775.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-12 Open Hole/Barefoot Completion 3715.00 3721.00 0
2011-10-07 Multi-Stage Fracture 3155.10 3155.20 0
2011-10-07 Multi-Stage Fracture 3085.40 3085.50 0
2011-10-08 Multi-Stage Fracture 3026.40 3026.50 0
2011-10-08 Multi-Stage Fracture 2967.30 2967.40 0
2011-10-08 Multi-Stage Fracture 2894.20 2894.30 0
2011-10-08 Multi-Stage Fracture 2834.70 2834.80 0
2011-10-08 Multi-Stage Fracture 2762.50 2762.60 0
2011-10-08 Multi-Stage Fracture 2707.90 2708.00 0
2011-10-08 Multi-Stage Fracture 2635.90 2636.00 0
2011-10-08 Multi-Stage Fracture 2564.90 2565.00 0
2011-10-07 Multi-Stage Fracture 3675.50 3675.60 0
2011-10-08 Multi-Stage Fracture 2504.20 2504.30 0
2011-10-08 Multi-Stage Fracture 2417.20 2417.30 0
2011-10-07 Multi-Stage Fracture 3614.80 3614.90 0
2011-10-07 Multi-Stage Fracture 3540.60 3540.70 0
2011-10-07 Multi-Stage Fracture 3481.70 3481.80 0
2011-10-07 Multi-Stage Fracture 3408.80 3408.90 0
2011-10-07 Multi-Stage Fracture 3355.10 3355.20 0
2011-10-07 Multi-Stage Fracture 3283.50 3283.60 0
2011-10-07 Multi-Stage Fracture 3214.90 3215.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1270 0.0 0.0 0.0
2012 7945 0.0 0.0 0.0
2013 8272 0.0 0.0 0.0
2014 7755 0.0 0.0 0.0
2015 7214 0.0 0.0 0.0
2016 8575 0.0 0.0 0.0
2017 8742 0.0 0.0 0.0
2018 7606 0.0 0.0 0.0
2019 8493 0.0 0.0 0.0
2020 2168 0.0 0.0 0.0

For data sources see[6]

References