X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0355073611000

Well Details

Well ID: 0355073611000
Loading map...
Location: 00/11-36-035-07W5/0
Location Alias: 00/11-36-35-07 W5M
Location Alias 2: 00/11-36-035-07 W5/00
Country: Canada
Province: Alberta
Township: 035
Meridian: 5
Range: 07
Section: 36
County/Municipality: Clearwater County
Well Name: NAL CAROL 11-36-35-7
Operator Name: NAL Resources Limited
License Number: 0429934
License Date: 2011-01-13
License Status: Suspension
Spud Date: 2011-01-31
Final Drill Date: 2011-03-05
Well Total Depth: 3648.00 m
Surface Hole Latitude: 52.043338
Surface Hole Longitude: -114.878156

For data sources see[1][2]

Well History

Date Event
2010-12-07 Well Log Performed
2011-01-13 Obtained License
2011-02-02 Surface Casing Operation Performed
2011-02-03 Well Log Performed
2011-02-08 Direction Drilling Operation Performed - Horizontal
2011-02-15 Intermediate Casing Operation Performed
2011-03-05 Finished Drilling
2011-03-05 Well Log Performed
2011-03-05 Well Mode changed to Drilled and Cased
2011-03-07 Liner Casing Operation Performed
2011-03-08 Rig Released
2011-03-11 Well Log Performed
2011-03-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-05-18 Well Began Production
2011-05-18 Well Fluid changed to Crude Oil
2011-05-18 Well Mode changed to Flowing
2012-05-27 Well Log Performed
2016-02-01 Well Fluid changed to Crude Oil
2016-02-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-08 2435.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-15 Multi-Stage Fracture 3639.70 3639.80 0
2011-03-17 Multi-Stage Fracture 3570.80 3570.90 0
2011-03-17 Multi-Stage Fracture 3507.20 3507.30 0
2011-03-17 Multi-Stage Fracture 3430.20 3430.30 0
2011-04-19 Acid Treatment 3430.20 3639.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5070 0.0 0.0 0.0
2012 7181 0.0 0.0 0.0
2013 7654 0.0 0.0 0.0
2014 6559 0.0 0.0 0.0
2015 1604 0.0 0.0 0.0
2016 8 0.0 0.0 0.0

For data sources see[6]

References