If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0364061012000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.078342,"lon":-110.789143,"icon":""}]} |
Location: 00/12-10-036-06W4/0 | |
Location Alias: 00/12-10-36-06 W4M | |
Location Alias 2: 00/12-10-036-06 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 036 | |
Meridian: 4 | |
Range: 06 | |
Section: 10 | |
County/Municipality: Special Areas No. 4 | |
Well Name: ALTEX ET AL PROVOST 12-10-36-6 | |
Operator Name: Prairie Provident Resources Canada Ltd. | |
License Number: 0133798 | |
License Date: 1988-05-10 | |
License Status: RecCertified | |
Spud Date: 1988-05-13 | |
Final Drill Date: 1988-05-17 | |
Well Total Depth: 1010.00 m | |
Surface Hole Latitude: 52.078342 | |
Surface Hole Longitude: -110.789143 |
Date | Event |
---|---|
1988-05-10 | Obtained License |
1988-05-14 | Surface Casing Operation Performed |
1988-05-17 | Finished Drilling |
1988-05-17 | Well Log Performed |
1988-05-17 | Well Mode changed to Drilled and Cased |
1988-05-18 | Drill Stem Test Performed |
1988-05-19 | Drill Stem Test Performed |
1988-05-20 | Production Casing Operation Performed |
1988-05-20 | Rig Released |
1988-05-30 | Perforation Treatment Performed - Jet Perforation |
1988-06-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-06-07 | Perforation Treatment Performed - Jet Perforation |
1988-06-21 | Well Began Production |
1988-06-21 | Well Fluid changed to Crude Oil |
1988-06-21 | Well Mode changed to Pumping |
1988-12-14 | Well Fluid changed to Crude Oil |
1988-12-14 | Well Mode changed to Suspended |
1995-05-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-05-03 | Plug Back Performed |
1995-05-03 | Well Fluid changed to Crude Oil |
1995-05-03 | Well Mode changed to Abandoned |
1995-05-05 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-05-30 | Perforation | 960.00 | 961.00 | 13 |
1988-06-02 | Acid Treatment | 960.00 | 961.00 | 0 |
1988-06-07 | Perforation | 962.00 | 963.00 | 13 |
1995-05-03 | Packing Device Capped w/Cement | 938.00 | 946.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 4173 | 0.0 | 0.0 | 0.0 |
1989 | 139 | 0.0 | 0.0 | 0.0 |
For data sources see[5]