X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364061510D00

Well Details

Well ID: 0364061510D00
Loading map...
Location: D0/10-15-036-06W4/0
Location Alias: D0/10-15-36-06 W4M
Location Alias 2: D0/10-15-036-06 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 06
Section: 15
County/Municipality: Special Areas No. 4
Well Name: ALTEX ET AL PROVOST 10D-15-36-6
Operator Name: Prairie Provident Resources Canada Ltd.
License Number: 0135549
License Date: 1988-08-12
License Status: RecCertified
Spud Date: 1988-08-26
Final Drill Date: 1988-08-29
Well Total Depth: 983.00 m
Surface Hole Latitude: 52.095519
Surface Hole Longitude: -110.773037

For data sources see[1][2]

Well History

Date Event
1988-08-12 Obtained License
1988-08-27 Surface Casing Operation Performed
1988-08-29 Finished Drilling
1988-08-29 Well Log Performed
1988-08-29 Well Mode changed to Drilled and Cased
1988-08-30 Production Casing Operation Performed
1988-08-30 Rig Released
1988-09-10 Perforation Treatment Performed - Jet Perforation
1988-09-10 Well Log Performed
1988-09-12 Perforation Treatment Performed - Jet Perforation
1988-09-12 Well Began Production
1988-09-12 Well Fluid changed to Crude Oil
1988-09-12 Well Log Performed
1988-09-12 Well Mode changed to Pumping
1994-03-31 Well Fluid changed to Crude Oil
1994-03-31 Well Mode changed to Suspended
1997-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-23 Plug Back Performed
1997-10-23 Well Fluid changed to Crude Oil
1997-10-23 Well Mode changed to Abandoned Zone
1997-10-25 Well Abandoned
1997-10-25 Well Fluid changed to Crude Oil
1997-10-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-10 Perforation 946.50 948.50 13
1988-09-12 Perforation 948.50 950.00 13
1997-10-23 Packing Device Capped w/Cement 930.50 938.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 2133 0.0 0.0 0.0
1989 8235 0.0 0.0 0.0
1990 8628 0.0 0.0 0.0
1991 8294 0.0 0.0 0.0
1992 8138 0.0 0.0 0.0
1993 3446 0.0 0.0 0.0
1994 1790 0.0 0.0 0.0

For data sources see[5]

References