X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364101506003

Well Details

Well ID: 0364101506003
Loading map...
Location: 00/06-15-036-10W4/3
Location Alias: 00/06-15-36-10 W4M
Location Alias 2: 00/06-15-036-10 W4/03
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 10
Section: 15
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 6-15-36-10
Operator Name: Karve Energy Inc.
License Number: 0041320
License Date: 1971-11-16
License Status: Issued
Spud Date: 1971-11-21
Final Drill Date: 1971-11-26
Well Total Depth: 1030.20 m
Surface Hole Latitude: 52.089644
Surface Hole Longitude: -111.354734

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-11-16 Obtained License
1971-11-25 Drill Stem Test Performed
1971-11-26 Drill Stem Test Performed
1971-11-26 Finished Drilling
1971-11-26 Well Mode changed to Drilled and Cased
1971-11-27 Drill Stem Test Performed
1971-11-28 Drill Stem Test Performed
1971-11-29 Production Casing Operation Performed
1971-12-20 Perforation Treatment Performed - Jet Perforation
1971-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-12-21 Perforation Treatment Performed - Fractured
1972-01-07 Perforation Treatment Performed - Jet Perforation
1972-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-01-09 Perforation Treatment Performed - Fractured
1980-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-12 Perforation Treatment Performed - Jet Perforation
1980-03-12 Plug Back Performed
1981-07-01 Well Began Production
1981-07-01 Well Fluid changed to Gas
1981-07-01 Well Mode changed to Flowing
2001-12-19 Well Fluid changed to Gas
2001-12-19 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-12-20 Perforation 992.70 998.50 7
1971-12-21 Acid Treatment 992.70 998.50 0
1971-12-21 Fracture 992.70 998.50 0
1972-01-07 Perforation 883.00 886.40 7
1972-01-09 Acid Treatment 883.00 886.40 0
1972-01-09 Fracture 883.00 886.40 0
1980-03-12 Packing Device Capped w/Cement 985.00 985.00 0
1980-03-12 Perforation 930.20 931.20 7
1980-03-12 Perforation 932.40 935.10 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 3696 0.0 0.0 0.0
1982 8512 0.0 0.0 0.0
1983 4168 0.0 0.0 0.0
1984 2591 0.0 0.0 0.0
1985 379 0.0 0.0 0.0
1986 1566 0.0 0.0 0.0
1987 190 0.0 0.0 0.0
1988 5762 0.0 0.0 0.0
1989 4996 0.0 0.0 0.0
1990 720 0.0 0.0 0.0
1991 971 0.0 0.0 0.0
1992 1134 0.0 0.0 0.0
1993 8717 0.0 0.0 0.0
1994 8269 0.0 0.0 0.0
1995 8536 0.0 0.0 0.0
1996 8573 0.0 0.0 0.0
1997 8504 0.0 0.0 0.0
1998 8449 0.0 0.0 0.0
1999 3539 0.0 0.0 0.0
2000 5054 0.0 0.0 0.0

For data sources see[5]

References