X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364102207000

Well Details

Well ID: 0364102207000
Loading map...
Location: 00/07-22-036-10W4/0
Location Alias: 00/07-22-36-10 W4M
Location Alias 2: 00/07-22-036-10 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 10
Section: 22
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 7-22-36-10
Operator Name: Karve Energy Inc.
License Number: 0058822
License Date: 1976-06-21
License Status: Issued
Spud Date: 1976-06-26
Final Drill Date: 1976-06-29
Well Total Depth: 1026.00 m
Surface Hole Latitude: 52.103441
Surface Hole Longitude: -111.344989

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-21 Obtained License
1976-06-28 Drill Stem Test Performed
1976-06-29 Finished Drilling
1976-07-01 Drill Stem Test Performed
1976-07-02 Production Casing Operation Performed
1976-07-02 Well Mode changed to Drilled and Cased
1977-02-03 Perforation Treatment Performed - Jet Perforation
1977-02-15 Perforation Treatment Performed - Jet Perforation
1977-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-18 Perforation Treatment Performed - Fractured
1977-03-08 Perforation Treatment Performed - Jet Perforation
1977-03-08 Well Mode changed to Drilled and Cased
1977-08-01 Well Began Production
1977-08-01 Well Fluid changed to Gas
1977-08-01 Well Mode changed to Flowing
1983-02-26 Well Fluid changed to Gas
1983-02-26 Well Mode changed to Suspended
1984-09-01 Well Fluid changed to Gas
1984-09-01 Well Mode changed to Flowing
2008-06-25 Well Fluid changed to Gas
2008-06-25 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-02-03 Perforation 929.90 931.80 13
1977-02-15 Perforation 916.80 918.10 13
1977-02-15 Perforation 922.00 923.20 13
1977-02-18 Acid Treatment 916.80 923.20 0
1977-02-18 Fracture 916.80 923.20 0
1977-03-08 Perforation 869.00 870.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 3672 0.0 0.0 0.0
1978 8664 0.0 0.0 0.0
1979 8592 0.0 0.0 0.0
1980 8735 0.0 0.0 0.0
1981 8687 0.0 0.0 0.0
1982 8391 0.0 0.0 0.0
1983 1340 0.0 0.0 0.0
1984 1961 0.0 0.0 0.0
1985 570 0.0 0.0 0.0
1986 718 0.0 0.0 0.0
1988 696 0.0 0.0 0.0
1989 6227 0.0 0.0 0.0
1990 4924 0.0 0.0 0.0
1991 883 0.0 0.0 0.0
1992 2625 0.0 0.0 0.0
1993 8752 0.0 0.0 0.0
1994 8706 0.0 0.0 0.0
1995 8716 0.0 0.0 0.0
1996 8741 0.0 0.0 0.0
1997 8745 0.0 0.0 0.0
1998 8754 0.0 0.0 0.0
1999 8731 0.0 0.0 0.0
2000 8753 0.0 0.0 0.0
2001 8619 0.0 0.0 0.0
2002 8539 0.0 0.0 0.0
2003 8584 0.0 0.0 0.0
2004 8775 0.0 0.0 0.0
2005 8695 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8729 0.0 0.0 0.0
2009 8718 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8566 0.0 0.0 0.0
2012 8731 0.0 0.0 0.0
2013 8447 0.0 0.0 0.0
2014 8342 0.0 0.0 0.0
2015 8569 0.0 0.0 0.0
2016 8544 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 8727 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References