X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364102310002

Well Details

Well ID: 0364102310002
Loading map...
Location: 00/10-23-036-10W4/2
Location Alias: 00/10-23-36-10 W4M
Location Alias 2: 00/10-23-036-10 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 10
Section: 23
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 10-23-36-10
Operator Name: Karve Energy Inc.
License Number: 0025923
License Date: 1964-03-25
License Status: Issued
Spud Date: 1964-03-29
Final Drill Date: 1964-04-04
Well Total Depth: 1021.10 m
Surface Hole Latitude: 52.108596
Surface Hole Longitude: -111.322351

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-03-25 Obtained License
1964-04-04 Finished Drilling
1964-04-04 Well Mode changed to Drilled and Cased
1964-04-06 Drill Stem Test Performed
1964-04-07 Drill Stem Test Performed
1964-04-08 Production Casing Operation Performed
1969-06-05 Perforation Treatment Performed - Fractured
1969-06-05 Perforation Treatment Performed - Jet Perforation
1970-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-08 Perforation Treatment Performed - Fractured
1982-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-01 Well Began Production
1982-11-01 Well Fluid changed to Gas
1982-11-01 Well Mode changed to Flowing
1992-11-16 Well Log Performed
1992-11-17 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-06-05 Perforation 970.50 972.30 7
1969-06-05 Perforation 866.50 867.80 13
1969-06-05 Fracture 866.50 867.80 0
1970-07-08 Acid Treatment 866.50 867.80 0
1970-07-08 Fracture 866.50 867.80 0
1982-01-28 Packing Device Capped w/Cement 950.30 966.00 0
1982-02-01 Acid Treatment 866.50 867.80 0
1992-11-17 Perforation 866.20 868.00 13
1969-06-05 Perforation 981.20 982.10 7
1969-06-05 Perforation 983.90 986.00 7
1969-06-05 Fracture 970.50 986.00 0
1969-06-05 Perforation 928.10 929.00 13
1969-06-05 Perforation 930.20 930.90 13
1969-06-05 Perforation 914.40 915.30 7
1969-06-05 Perforation 916.20 918.10 7
1969-06-05 Fracture 914.40 930.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 7486 0.0 0.0 0.0
1983 1339 0.0 0.0 0.0
1984 2409 0.0 0.0 0.0
1985 591 0.0 0.0 0.0
1986 1583 0.0 0.0 0.0
1988 2866 0.0 0.0 0.0
1989 2429 0.0 0.0 0.0
1991 1389 0.0 0.0 0.0
1992 1585 0.0 0.0 0.0
1993 8004 0.0 0.0 0.0
1994 6656 0.0 0.0 0.0
1995 5631 0.0 0.0 0.0
1996 3599 0.0 0.0 0.0
1997 5244 0.0 0.0 0.0
1998 4703 0.0 0.0 0.0
1999 5593 0.0 0.0 0.0
2000 6146 0.0 0.0 0.0
2001 8264 0.0 0.0 0.0
2002 8611 0.0 0.0 0.0
2003 8548 0.0 0.0 0.0
2004 8740 0.0 0.0 0.0
2005 8747 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8284 0.0 0.0 0.0
2009 7528 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8687 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 5591 0.0 0.0 0.0
2015 8746 0.0 0.0 0.0
2016 8696 0.0 0.0 0.0
2017 3741 0.0 0.0 0.0
2018 792 0.0 0.0 0.0
2019 5616 0.0 0.0 0.0
2020 1847 0.0 0.0 0.0

For data sources see[5]

References