X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364110802000

Well Details

Well ID: 0364110802000
Loading map...
Location: 00/02-08-036-11W4/0
Location Alias: 00/02-08-36-11 W4M
Location Alias 2: 00/02-08-036-11 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 11
Section: 08
County/Municipality: County of Paintearth No. 18
Well Name: MOSBACHER ET AL PROVOST 2-8-36-11
Operator Name: Rocky River Resources Ltd.
License Number: 0036180
License Date: 1969-05-13
License Status: RecCertified
Spud Date: 1969-08-27
Final Drill Date: 1969-08-30
Well Total Depth: 933.30 m
Surface Hole Latitude: 52.072422
Surface Hole Longitude: -111.537028

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-05-13 Obtained License
1969-08-30 Finished Drilling
1969-08-30 Well Mode changed to Drilled and Cased
1969-08-31 Production Casing Operation Performed
1969-10-14 Perforation Treatment Performed - Jet Perforation
1969-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-10-15 Perforation Treatment Performed - Fractured
1970-05-13 Well Began Injection
1970-05-13 Well Fluid changed to Water
1970-05-13 Well Type changed to Injection
1971-06-01 Well Fluid changed to Water
1971-06-01 Well Mode changed to Suspended
1971-06-01 Well Type changed to Injection
1973-06-01 Well Fluid changed to Water
1973-06-01 Well Type changed to Injection
1986-04-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-04-30 Plug Back Performed
1986-04-30 Well Fluid changed to Water
1986-04-30 Well Mode changed to Abandoned
1986-04-30 Well Type changed to Injection
1986-05-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-10-14 Perforation 917.80 919.30 7
1969-10-15 Acid Treatment 917.80 919.30 0
1969-10-15 Fracture 917.80 919.30 0
1986-04-30 Packing Device Capped w/Cement 899.00 907.00 0
1986-04-30 Packing Device Capped w/Cement 187.00 195.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0

For data sources see[5]

References