X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364121502002

Well Details

Well ID: 0364121502002
Loading map...
Location: 00/02-15-036-12W4/2
Location Alias: 00/02-15-36-12 W4M
Location Alias 2: 00/02-15-036-12 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 12
Section: 15
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 2-15-36-12
Operator Name: Karve Energy Inc.
License Number: 0391620
License Date: 2008-01-11
License Status: Issued
Spud Date: 2008-01-17
Final Drill Date: 2008-01-20
Well Total Depth: 1112.00 m
Surface Hole Latitude: 52.085415
Surface Hole Longitude: -111.632588

For data sources see[1][2]

Well History

Date Event
2008-01-11 Obtained License
2008-01-17 Surface Casing Operation Performed
2008-01-19 Production Casing Operation Performed
2008-01-19 Well Log Performed
2008-01-20 Finished Drilling
2008-01-20 Rig Released
2008-01-20 Well Mode changed to Drilled and Cased
2008-02-24 Perforation Treatment Performed - Cement Plug
2008-02-25 Well Log Performed
2008-02-28 Perforation Treatment Performed - Jet Perforation
2008-02-28 Well Log Performed
2008-02-29 Perforation Treatment Performed - Remedial Casing
2008-03-12 Perforation Treatment Performed - Jet Perforation
2008-03-12 Well Log Performed
2008-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-26 Perforation Treatment Performed - Jet Perforation
2008-03-26 Plug Back Performed
2008-03-26 Well Log Performed
2008-06-07 Well Began Production
2008-06-07 Well Fluid changed to Gas
2008-06-07 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-02-24 Cement Plug 1103.60 1110.00 0
2008-02-28 Perforation 157.00 158.00 13
2008-02-29 Remedial Casing Cementing 157.00 158.00 0
2008-03-12 Perforation 1079.50 1080.00 13
2008-03-26 Packing Device Capped w/Cement 1067.00 1075.30 0
2008-03-26 Perforation 934.00 936.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4989 0.0 0.0 0.0
2009 5062 0.0 0.0 0.0
2010 5182 0.0 0.0 0.0
2011 3834 0.0 0.0 0.0
2012 8163 0.0 0.0 0.0
2013 7019 0.0 0.0 0.0
2014 3074 0.0 0.0 0.0
2015 6697 0.0 0.0 0.0
2016 567 0.0 0.0 0.0
2017 7898 0.0 0.0 0.0
2018 3955 0.0 0.0 0.0
2019 504 0.0 0.0 0.0

For data sources see[5]

References