If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364131109002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.077863,"lon":-111.748821,"icon":""}]} |
| Location: 00/09-11-036-13W4/2 | |
| Location Alias: 00/09-11-36-13 W4M | |
| Location Alias 2: 00/09-11-036-13 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 13 | |
| Section: 11 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: CPEC PROVOST 9-11-36-13 | |
| Operator Name: Crescent Point Energy Corp. | |
| License Number: 0354781 | |
| License Date: 2006-03-28 | |
| License Status: Abandoned | |
| Spud Date: 2006-07-19 | |
| Final Drill Date: 2006-07-23 | |
| Well Total Depth: 1117.00 m | |
| Surface Hole Latitude: 52.077863 | |
| Surface Hole Longitude: -111.748821 |
| Date | Event |
|---|---|
| 2006-03-28 | Obtained License |
| 2006-07-21 | Surface Casing Operation Performed |
| 2006-07-22 | Well Log Performed |
| 2006-07-23 | Finished Drilling |
| 2006-07-23 | Production Casing Operation Performed |
| 2006-07-23 | Rig Released |
| 2006-07-23 | Well Mode changed to Drilled and Cased |
| 2006-08-01 | Perforation Treatment Performed - Jet Perforation |
| 2006-08-03 | Perforation Treatment Performed - Fractured |
| 2006-08-17 | Perforation Treatment Performed - Jet Perforation |
| 2008-01-21 | Perforation Treatment Performed - Fractured |
| 2008-03-07 | Perforation Treatment Performed - Jet Perforation |
| 2017-05-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-05-18 | Plug Back Performed |
| 2017-05-18 | Well Log Performed |
| 2017-05-19 | Well Log Performed |
| 2017-05-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-05-20 | Perforation Treatment Performed - Cement Squeeze |
| 2017-05-20 | Plug Back Performed |
| 2017-05-20 | Well Mode changed to Abandoned Zone |
| 2017-05-23 | Perforation Treatment Performed - Jet Perforation |
| 2017-05-23 | Well Log Performed |
| 2017-05-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-05-24 | Perforation Treatment Performed - Cement Squeeze |
| 2017-05-24 | Plug Back Performed |
| 2017-05-25 | Well Log Performed |
| 2017-05-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-05-26 | Perforation Treatment Performed - Cement Squeeze |
| 2017-05-26 | Plug Back Performed |
| 2017-08-11 | Well Abandoned |
| 2017-08-11 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-08-01 | Perforation | 1049.00 | 1052.00 | 17 |
| 2017-05-24 | Cement Squeeze | 638.00 | 640.00 | 0 |
| 2017-05-24 | Packing Device Capped w/Cement | 610.00 | 635.00 | 0 |
| 2017-05-26 | Cement Squeeze | 229.00 | 232.00 | 0 |
| 2017-05-26 | Packing Device Capped w/Cement | 218.40 | 226.40 | 0 |
| 2006-08-03 | Fracture | 1049.00 | 1052.00 | 0 |
| 2006-08-17 | Perforation | 951.50 | 953.50 | 17 |
| 2008-01-21 | Fracture | 951.50 | 953.50 | 0 |
| 2008-03-07 | Perforation | 229.00 | 232.00 | 13 |
| 2017-05-18 | Packing Device Capped w/Cement | 1026.50 | 1034.50 | 0 |
| 2017-05-20 | Cement Squeeze | 951.50 | 953.50 | 0 |
| 2017-05-20 | Packing Device Capped w/Cement | 939.80 | 948.00 | 0 |
| 2017-05-23 | Perforation | 638.00 | 640.00 | 17 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-05-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]