X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364200105000

Well Details

Well ID: 0364200105000
Loading map...
Location: 00/05-01-036-20W4/0
Location Alias: 00/05-01-36-20 W4M
Location Alias 2: 00/05-01-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 01
County/Municipality: County of Stettler No. 6
Well Name: CPR JOHN NO. 5
Operator Name: Gulf Canada Limited
License Number: 0006063
License Date: 1953-02-13
License Status: RecCertified
Spud Date: 1953-03-07
Final Drill Date: 1953-04-03
Well Total Depth: 1649.00 m
Surface Hole Latitude: 52.060747
Surface Hole Longitude: -112.740227

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-02-13 Obtained License
1953-03-08 Lost Circulation Occurred
1953-03-20 Lost Circulation Occurred
1953-04-03 Drill Stem Test Performed
1953-04-03 Finished Drilling
1953-04-03 Perforation Treatment Performed - Open-Hole Completion
1953-04-03 Production Casing Operation Performed
1953-04-03 Well Mode changed to Drilled and Cased
1953-04-14 Well Began Production
1953-04-14 Well Fluid changed to Crude Oil
1953-04-14 Well Mode changed to Flowing
1979-06-05 Perforation Treatment Performed - Cement Plug
1979-06-05 Perforation Treatment Performed - Open-Hole Completion
1980-11-03 Well Fluid changed to Crude Oil
1980-11-03 Well Mode changed to Pumping
1983-12-18 Well Log Performed
1983-12-20 Perforation Treatment Performed - Cement Squeeze
1983-12-20 Well Log Performed
1983-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-12-21 Perforation Treatment Performed - Jet Perforation
1985-07-17 Well Log Performed
1985-07-19 Perforation Treatment Performed - Cement Squeeze
1985-07-19 Well Log Performed
1985-07-22 Well Log Performed
1985-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-23 Perforation Treatment Performed - Jet Perforation
1985-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-24 Perforation Treatment Performed - Jet Perforation
1986-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-17 Plug Back Performed
1986-12-17 Well Fluid changed to Crude Oil
1986-12-17 Well Mode changed to Abandoned Zone
1991-07-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-30 Perforation Treatment Performed - Jet Perforation
1991-07-30 Plug Back Performed
1991-07-31 Perforation Treatment Performed - Remedial Casing
1991-07-31 Well Fluid changed to Crude Oil
1991-07-31 Well Mode changed to Abandoned
1991-08-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-04-03 Open Hole/Barefoot Completion 1632.20 1649.00 0
1985-07-24 Perforation 1625.50 1627.70 0
1985-07-24 Acid Treatment 1625.50 1627.70 0
1986-12-17 Packing Device Capped w/Cement 1620.00 1620.00 0
1991-07-30 Perforation 1198.00 1198.50 13
1991-07-30 Packing Device Capped w/Cement 1187.00 1195.00 0
1991-07-30 Perforation 256.90 257.40 13
1991-07-31 Remedial Casing Cementing 256.90 257.40 0
1979-06-05 Cement Plug 1636.70 1649.00 0
1979-06-05 Open Hole/Barefoot Completion 1632.20 1636.70 0
1983-12-20 Cement Squeeze 1632.20 1636.70 0
1983-12-21 Perforation 1623.80 1628.00 13
1983-12-21 Acid Treatment 1623.80 1628.00 0
1985-07-19 Cement Squeeze 1623.80 1628.00 0
1985-07-23 Perforation 1621.50 1625.50 13
1985-07-23 Acid Treatment 1621.50 1625.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1979 2948 0.0 0.0 0.0
1980 6934 0.0 0.0 0.0
1981 7003 0.0 0.0 0.0
1982 6338 0.0 0.0 0.0
1983 6948 0.0 0.0 0.0
1984 8314 0.0 0.0 0.0
1985 7697 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1953-03-08 Lost Circulation 128.00 128.00
1953-03-20 Lost Circulation 1321.00 1328.00

For data sources see[6]

References