X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364202311022

Well Details

Well ID: 0364202311022
Loading map...
Location: 02/11-23-036-20W4/2
Location Alias: 02/11-23-36-20 W4M
Location Alias 2: 02/11-23-036-20 W4/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 23
County/Municipality: County of Stettler No. 6
Well Name: PENGROWTH 102 FENNBV 11-23-36-20
Operator Name: Cona Resources Ltd.
License Number: 0104696
License Date: 1983-12-14
License Status: Abandoned
Spud Date: 1983-12-16
Final Drill Date: 1984-01-07
Well Total Depth: 1648.00 m
Surface Hole Latitude: 52.106875
Surface Hole Longitude: -112.755972

For data sources see[1][2]

Well History

Date Event
1983-12-14 Obtained License
1983-12-16 Direction Drilling Operation Performed - 98
1984-01-03 Lost Circulation Occurred
1984-01-07 Finished Drilling
1984-01-07 Well Mode changed to Drilled and Cased
1984-01-08 Well Log Performed
1984-01-09 Drill Stem Test Performed
1984-01-10 Drill Stem Test Performed
1984-01-11 Production Casing Operation Performed
1984-02-06 Well Log Performed
1984-02-07 Perforation Treatment Performed - Jet Perforation
1984-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-09 Perforation Treatment Performed - Jet Perforation
1984-03-12 Well Began Production
1984-03-12 Well Fluid changed to Crude Oil
1984-03-12 Well Mode changed to Pumping
1984-12-14 Perforation Treatment Performed - Cement Squeeze
1984-12-17 Well Log Performed
1984-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-18 Perforation Treatment Performed - Jet Perforation
1985-05-11 Perforation Treatment Performed - Cement Squeeze
1985-05-13 Well Log Performed
1985-05-14 Perforation Treatment Performed - Jet Perforation
1985-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-25 Perforation Treatment Performed - Cement Squeeze
1992-07-25 Plug Back Performed
1992-07-25 Well Fluid changed to Crude Oil
1992-07-25 Well Mode changed to Abandoned Zone
1997-10-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-11 Plug Back Performed
1997-10-11 Well Log Performed
1997-10-30 Well Log Performed
2008-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-23 Well Log Performed
2008-09-24 Perforation Treatment Performed - Cement Plug
2008-09-25 Perforation Treatment Performed - Jet Perforation
2008-09-25 Well Log Performed
2008-09-26 Perforation Treatment Performed - Cement Squeeze
2008-09-26 Well Log Performed
2008-09-27 Perforation Treatment Performed - Jet Perforation
2008-09-28 Perforation Treatment Performed - Cement Squeeze
2008-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-29 Perforation Treatment Performed - Cement Squeeze
2008-09-29 Perforation Treatment Performed - Jet Perforation
2008-09-29 Plug Back Performed
2008-09-30 Well Log Performed
2008-10-07 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1983-12-16 1000.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-07 Perforation 1627.60 1628.60 13
1985-05-15 Acid Treatment 1581.50 1583.00 0
1992-07-24 Acid Treatment 1581.50 1583.00 0
1992-07-25 Cement Squeeze 1581.50 1583.00 0
1997-10-11 Packing Device Capped w/Cement 1606.00 1614.00 0
1997-10-11 Packing Device Capped w/Cement 1565.00 1573.00 0
2008-09-23 Packing Device Capped w/Cement 1588.90 1608.90 0
2008-09-24 Cement Plug 1325.00 1401.00 0
2008-09-25 Perforation 316.70 317.70 17
2008-09-26 Cement Squeeze 316.70 317.70 0
2008-09-27 Perforation 293.00 294.00 17
1984-02-08 Acid Treatment 1627.60 1628.60 0
2008-09-28 Cement Squeeze 293.00 294.00 0
2008-09-29 Perforation 235.00 236.00 17
2008-09-29 Cement Squeeze 235.00 236.00 0
2008-09-29 Packing Device Capped w/Cement 222.00 230.00 0
1984-02-09 Perforation 1583.00 1585.50 13
1984-02-09 Acid Treatment 1583.00 1585.50 0
1984-12-14 Cement Squeeze 1583.00 1585.50 0
1984-12-18 Perforation 1581.50 1583.50 13
1984-12-18 Acid Treatment 1581.50 1583.50 0
1985-05-11 Cement Squeeze 1581.50 1583.50 0
1985-05-14 Perforation 1581.50 1583.00 26

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 5862 0.0 0.0 0.0
1985 8448 0.0 0.0 0.0
1986 8689 0.0 0.0 0.0
1987 8404 0.0 0.0 0.0
1988 8675 0.0 0.0 0.0
1989 8420 0.0 0.0 0.0
1990 8696 0.0 0.0 0.0
1991 8209 0.0 0.0 0.0
1992 4355 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-01-03 Lost Circulation 1586.00 1586.00

For data sources see[7]

References