X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364203501000

Well Details

Well ID: 0364203501000
Loading map...
Location: 00/01-35-036-20W4/0
Location Alias: 00/01-35-36-20 W4M
Location Alias 2: 00/01-35-036-20 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 20
Section: 35
County/Municipality: County of Stettler No. 6
Well Name: CPR ROBERT NO. 1
Operator Name: Gulf Canada Limited
License Number: 0006932
License Date: 1953-08-13
License Status: RecCertified
Spud Date: 1953-08-24
Final Drill Date: 1953-09-11
Well Total Depth: 1620.30 m
Surface Hole Latitude: 52.130485
Surface Hole Longitude: -112.745744

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-08-13 Obtained License
1953-08-14 Perforation Treatment Performed - Open-Hole Completion
1953-09-11 Finished Drilling
1953-09-11 Well Mode changed to Drilled and Cased
1953-09-12 Production Casing Operation Performed
1953-09-16 Well Began Production
1953-09-16 Well Fluid changed to Crude Oil
1953-09-16 Well Mode changed to Flowing
1982-03-20 Perforation Treatment Performed - Jet Perforation
1982-03-20 Perforation Treatment Performed - Open-Hole Completion
1982-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-15 Well Fluid changed to Crude Oil
1984-03-15 Well Mode changed to Suspended
1993-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-13 Perforation Treatment Performed - Jet Perforation
1993-09-13 Plug Back Performed
1993-09-14 Perforation Treatment Performed - Remedial Casing
1993-09-14 Well Fluid changed to Crude Oil
1993-09-14 Well Mode changed to Abandoned
1994-04-15 Well Abandoned
1997-04-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-08-14 Open Hole/Barefoot Completion 1603.20 1620.30 0
1982-03-20 Perforation 1607.20 1620.30 0
1982-03-20 Open Hole/Barefoot Completion 1603.20 1607.20 0
1982-03-23 Acid Treatment 1603.20 1607.20 0
1993-09-13 Packing Device Capped w/Cement 1590.00 1598.00 0
1993-09-13 Perforation 227.80 228.30 7
1993-09-14 Remedial Casing Cementing 227.80 228.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5754 0.0 0.0 0.0
1968 5593 0.0 0.0 0.0
1969 6039 0.0 0.0 0.0
1970 4295 0.0 0.0 0.0
1971 3868 0.0 0.0 0.0
1972 5468 0.0 0.0 0.0
1973 7470 0.0 0.0 0.0
1974 6884 0.0 0.0 0.0
1975 5789 0.0 0.0 0.0
1976 5256 0.0 0.0 0.0
1977 5424 0.0 0.0 0.0
1978 4816 0.0 0.0 0.0
1979 7111 0.0 0.0 0.0
1980 7228 0.0 0.0 0.0
1981 7430 0.0 0.0 0.0
1982 6067 0.0 0.0 0.0
1983 6906 0.0 0.0 0.0
1984 1083 0.0 0.0 0.0

For data sources see[5]

References