If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364220911020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.079203,"lon":-113.093744,"icon":""}]} |
| Location: 02/11-09-036-22W4/0 | |
| Location Alias: 02/11-09-36-22 W4M | |
| Location Alias 2: 02/11-09-036-22 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 22 | |
| Section: 09 | |
| County/Municipality: Red Deer County | |
| Well Name: EMBER 102 MIKWAN 11-9-36-22 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0346473 | |
| License Date: 2005-12-21 | |
| License Status: Issued | |
| Spud Date: 2006-01-01 | |
| Final Drill Date: 2006-01-02 | |
| Well Total Depth: 799.00 m | |
| Surface Hole Latitude: 52.079203 | |
| Surface Hole Longitude: -113.093744 |
| Date | Event |
|---|---|
| 2005-12-21 | Obtained License |
| 2006-01-01 | Surface Casing Operation Performed |
| 2006-01-02 | Finished Drilling |
| 2006-01-02 | Production Casing Operation Performed |
| 2006-01-02 | Rig Released |
| 2006-01-02 | Well Mode changed to Drilled and Cased |
| 2006-01-07 | Well Log Performed |
| 2006-07-09 | Perforation Treatment Performed - Jet Perforation |
| 2006-07-19 | Perforation Treatment Performed - Fractured |
| 2006-07-30 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2006-07-30 | Well Mode changed to Testing |
| 2006-08-14 | Well Began Production |
| 2006-08-14 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2006-08-14 | Well Mode changed to Flowing |
| 2011-08-23 | Perforation Treatment Performed - Jet Perforation |
| 2011-08-25 | Perforation Treatment Performed - Fractured |
| 2011-09-01 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2011-09-01 | Well Mode changed to Suspended |
| 2011-09-02 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2011-09-02 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-07-09 | Perforation | 504.30 | 505.30 | 13 |
| 2006-07-09 | Perforation | 405.50 | 406.50 | 13 |
| 2006-07-09 | Perforation | 403.00 | 404.00 | 13 |
| 2006-07-09 | Perforation | 393.00 | 394.00 | 13 |
| 2006-07-09 | Perforation | 389.90 | 390.90 | 13 |
| 2006-07-09 | Perforation | 387.90 | 388.90 | 13 |
| 2006-07-09 | Perforation | 382.90 | 383.90 | 13 |
| 2006-07-09 | Perforation | 377.50 | 378.50 | 13 |
| 2006-07-09 | Perforation | 374.30 | 375.40 | 13 |
| 2006-07-09 | Perforation | 369.50 | 370.50 | 13 |
| 2006-07-09 | Perforation | 364.60 | 365.60 | 13 |
| 2006-07-09 | Perforation | 484.10 | 485.10 | 13 |
| 2006-07-09 | Perforation | 312.70 | 313.70 | 13 |
| 2006-07-09 | Perforation | 309.40 | 310.40 | 13 |
| 2006-07-09 | Perforation | 267.90 | 268.90 | 13 |
| 2006-07-19 | Fracture | 267.90 | 505.30 | 0 |
| 2011-08-23 | Perforation | 268.20 | 268.70 | 13 |
| 2011-08-23 | Perforation | 309.70 | 310.20 | 13 |
| 2011-08-23 | Perforation | 313.00 | 313.50 | 13 |
| 2011-08-23 | Perforation | 364.40 | 365.90 | 13 |
| 2011-08-23 | Perforation | 369.50 | 370.50 | 13 |
| 2011-08-23 | Perforation | 374.60 | 375.10 | 13 |
| 2006-07-09 | Perforation | 480.40 | 481.40 | 13 |
| 2011-08-23 | Perforation | 377.50 | 378.50 | 13 |
| 2011-08-23 | Perforation | 382.60 | 384.10 | 13 |
| 2011-08-23 | Perforation | 387.90 | 388.90 | 13 |
| 2011-08-23 | Perforation | 389.90 | 390.90 | 13 |
| 2011-08-23 | Perforation | 393.20 | 393.70 | 13 |
| 2011-08-23 | Perforation | 403.30 | 403.80 | 13 |
| 2011-08-23 | Perforation | 405.80 | 406.30 | 13 |
| 2011-08-23 | Perforation | 412.30 | 415.30 | 13 |
| 2011-08-23 | Perforation | 420.80 | 421.30 | 13 |
| 2011-08-23 | Perforation | 422.00 | 424.00 | 13 |
| 2006-07-09 | Perforation | 471.70 | 473.70 | 13 |
| 2011-08-23 | Perforation | 443.80 | 444.30 | 13 |
| 2011-08-23 | Perforation | 450.70 | 451.70 | 13 |
| 2011-08-23 | Perforation | 471.40 | 473.90 | 13 |
| 2011-08-23 | Perforation | 480.40 | 481.40 | 13 |
| 2011-08-23 | Perforation | 483.90 | 485.40 | 13 |
| 2011-08-23 | Perforation | 504.00 | 505.60 | 13 |
| 2011-08-25 | Fracture | 268.20 | 505.60 | 0 |
| 2006-07-09 | Perforation | 450.70 | 451.70 | 13 |
| 2006-07-09 | Perforation | 443.60 | 444.60 | 13 |
| 2006-07-09 | Perforation | 422.00 | 424.00 | 13 |
| 2006-07-09 | Perforation | 420.60 | 421.60 | 13 |
| 2006-07-09 | Perforation | 412.30 | 415.30 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 3313 | 0.0 | 0.0 | 0.0 |
| 2007 | 8711 | 0.0 | 0.0 | 0.0 |
| 2008 | 8692 | 0.0 | 0.0 | 0.0 |
| 2009 | 8750 | 0.0 | 0.0 | 0.0 |
| 2010 | 8728 | 0.0 | 0.0 | 0.0 |
| 2011 | 8387 | 0.0 | 0.0 | 0.0 |
| 2012 | 8623 | 0.0 | 0.0 | 0.0 |
| 2013 | 8341 | 0.0 | 0.0 | 0.0 |
| 2014 | 7883 | 0.0 | 0.0 | 0.0 |
| 2015 | 8339 | 0.0 | 0.0 | 0.0 |
| 2016 | 8532 | 0.0 | 0.0 | 0.0 |
| 2017 | 8341 | 0.0 | 0.0 | 0.0 |
| 2018 | 7168 | 0.0 | 0.0 | 0.0 |
| 2019 | 8039 | 0.0 | 0.0 | 0.0 |
| 2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[5]