If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364222216000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.109128,"lon":-113.066971,"icon":""}]} |
| Location: 00/16-22-036-22W4/0 | |
| Location Alias: 00/16-22-36-22 W4M | |
| Location Alias 2: 00/16-22-036-22 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 22 | |
| Section: 22 | |
| County/Municipality: Red Deer County | |
| Well Name: EMBER SD MIKWAN 16-22-36-22 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0420341 | |
| License Date: 2010-05-11 | |
| License Status: Amended | |
| Spud Date: 2010-08-29 | |
| Final Drill Date: 2010-08-30 | |
| Well Total Depth: 1116.00 m | |
| Surface Hole Latitude: 52.109128 | |
| Surface Hole Longitude: -113.066971 |
| Date | Event |
|---|---|
| 2010-05-11 | Obtained License |
| 2010-08-29 | Direction Drilling Operation Performed - Deviate |
| 2010-08-29 | Surface Casing Operation Performed |
| 2010-08-30 | Finished Drilling |
| 2010-08-30 | Well Mode changed to Drilled and Cased |
| 2010-08-31 | Production Casing Operation Performed |
| 2010-08-31 | Rig Released |
| 2010-09-12 | Well Log Performed |
| 2010-10-02 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-26 | Perforation Treatment Performed - Fractured |
| 2010-11-30 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2010-11-30 | Well Mode changed to Testing |
| 2010-12-09 | Well Began Production |
| 2010-12-09 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2010-12-09 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-08-29 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-10-02 | Perforation | 504.00 | 507.50 | 13 |
| 2010-10-02 | Perforation | 324.40 | 325.90 | 13 |
| 2010-10-02 | Perforation | 356.10 | 357.10 | 13 |
| 2010-10-02 | Perforation | 427.60 | 428.60 | 13 |
| 2010-10-02 | Perforation | 414.40 | 415.90 | 13 |
| 2010-10-02 | Perforation | 360.80 | 362.30 | 13 |
| 2010-10-02 | Perforation | 680.50 | 683.00 | 13 |
| 2010-10-02 | Perforation | 679.50 | 680.50 | 13 |
| 2010-10-02 | Perforation | 656.40 | 657.40 | 13 |
| 2010-10-02 | Perforation | 1076.30 | 1077.80 | 13 |
| 2010-10-02 | Perforation | 1080.60 | 1082.60 | 13 |
| 2010-10-02 | Perforation | 491.70 | 495.20 | 13 |
| 2010-10-02 | Perforation | 686.30 | 688.30 | 13 |
| 2010-10-02 | Perforation | 569.30 | 571.80 | 13 |
| 2010-10-02 | Perforation | 551.10 | 552.60 | 13 |
| 2010-10-02 | Perforation | 542.00 | 545.50 | 13 |
| 2010-10-02 | Perforation | 608.10 | 610.60 | 13 |
| 2010-10-02 | Perforation | 647.90 | 649.40 | 13 |
| 2010-10-02 | Perforation | 632.40 | 634.90 | 13 |
| 2010-11-26 | Fracture | 324.40 | 657.40 | 0 |
| 2010-11-26 | Fracture | 679.50 | 688.30 | 0 |
| 2010-11-26 | Fracture | 1076.30 | 1082.60 | 0 |
| 2010-10-02 | Perforation | 477.10 | 478.60 | 13 |
| 2010-10-02 | Perforation | 510.90 | 512.90 | 13 |
| 2010-10-02 | Perforation | 539.30 | 540.80 | 13 |
| 2010-10-02 | Perforation | 531.80 | 532.80 | 13 |
| 2010-10-02 | Perforation | 516.30 | 518.80 | 13 |
| 2010-10-02 | Perforation | 333.30 | 334.30 | 13 |
| 2010-10-02 | Perforation | 327.70 | 328.70 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 552 | 0.0 | 0.0 | 0.0 |
| 2011 | 8744 | 0.0 | 0.0 | 0.0 |
| 2012 | 8716 | 0.0 | 0.0 | 0.0 |
| 2013 | 8737 | 0.0 | 0.0 | 0.0 |
| 2014 | 8700 | 0.0 | 0.0 | 0.0 |
| 2015 | 8711 | 0.0 | 0.0 | 0.0 |
| 2016 | 8694 | 0.0 | 0.0 | 0.0 |
| 2017 | 8720 | 0.0 | 0.0 | 0.0 |
| 2018 | 8615 | 0.0 | 0.0 | 0.0 |
| 2019 | 8706 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]