If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364222307002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.10304,"lon":-113.039148,"icon":""}]} |
| Location: 00/07-23-036-22W4/2 | |
| Location Alias: 00/07-23-36-22 W4M | |
| Location Alias 2: 00/07-23-036-22 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 22 | |
| Section: 23 | |
| County/Municipality: Red Deer County | |
| Well Name: EMBER MIKWAN 7-23-36-22 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0351591 | |
| License Date: 2006-02-09 | |
| License Status: Issued | |
| Spud Date: 2006-02-17 | |
| Final Drill Date: 2006-02-18 | |
| Well Total Depth: 779.00 m | |
| Surface Hole Latitude: 52.103040 | |
| Surface Hole Longitude: -113.039148 |
| Date | Event |
|---|---|
| 2006-02-09 | Obtained License |
| 2006-02-17 | Surface Casing Operation Performed |
| 2006-02-18 | Finished Drilling |
| 2006-02-18 | Production Casing Operation Performed |
| 2006-02-18 | Rig Released |
| 2006-02-18 | Well Log Performed |
| 2006-02-18 | Well Mode changed to Drilled and Cased |
| 2006-03-16 | Perforation Treatment Performed - Jet Perforation |
| 2006-03-16 | Well Log Performed |
| 2006-06-25 | Perforation Treatment Performed - Fractured |
| 2009-07-31 | Perforation Treatment Performed - Jet Perforation |
| 2009-08-28 | Perforation Treatment Performed - Fractured |
| 2009-09-01 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2009-09-01 | Well Mode changed to Testing |
| 2009-09-02 | Well Began Production |
| 2009-09-02 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2009-09-02 | Well Mode changed to Flowing |
| 2009-10-02 | Well Log Performed |
| 2010-02-19 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-03-16 | Perforation | 471.50 | 472.50 | 13 |
| 2006-03-16 | Perforation | 362.40 | 363.40 | 13 |
| 2006-03-16 | Perforation | 359.40 | 360.40 | 13 |
| 2006-03-16 | Perforation | 356.70 | 357.70 | 13 |
| 2006-03-16 | Perforation | 345.10 | 346.10 | 13 |
| 2006-03-16 | Perforation | 341.60 | 342.60 | 13 |
| 2006-03-16 | Perforation | 338.20 | 339.20 | 13 |
| 2006-03-16 | Perforation | 336.70 | 338.70 | 13 |
| 2006-03-16 | Perforation | 332.90 | 333.90 | 13 |
| 2006-03-16 | Perforation | 318.60 | 319.60 | 13 |
| 2006-03-16 | Perforation | 272.00 | 273.00 | 13 |
| 2006-03-16 | Perforation | 470.50 | 471.50 | 13 |
| 2006-03-16 | Perforation | 270.10 | 271.10 | 13 |
| 2006-03-16 | Perforation | 237.50 | 238.50 | 13 |
| 2006-03-16 | Perforation | 233.90 | 234.90 | 13 |
| 2006-03-16 | Perforation | 228.90 | 229.90 | 13 |
| 2006-06-25 | Fracture | 228.90 | 472.50 | 0 |
| 2009-07-31 | Perforation | 758.30 | 759.30 | 13 |
| 2009-07-31 | Perforation | 752.90 | 753.90 | 13 |
| 2009-07-31 | Perforation | 747.20 | 747.70 | 13 |
| 2009-07-31 | Perforation | 733.50 | 734.00 | 13 |
| 2009-07-31 | Perforation | 725.00 | 726.00 | 13 |
| 2006-03-16 | Perforation | 448.90 | 449.90 | 13 |
| 2009-08-28 | Fracture | 725.20 | 759.30 | 0 |
| 2006-03-16 | Perforation | 433.20 | 435.20 | 13 |
| 2006-03-16 | Perforation | 416.30 | 417.30 | 13 |
| 2006-03-16 | Perforation | 387.10 | 388.10 | 13 |
| 2006-03-16 | Perforation | 369.20 | 370.20 | 13 |
| 2006-03-16 | Perforation | 365.70 | 366.70 | 13 |
| 2006-03-16 | Perforation | 364.40 | 365.40 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 2616 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8744 | 0.0 | 0.0 | 0.0 |
| 2012 | 8716 | 0.0 | 0.0 | 0.0 |
| 2013 | 8737 | 0.0 | 0.0 | 0.0 |
| 2014 | 8700 | 0.0 | 0.0 | 0.0 |
| 2015 | 8711 | 0.0 | 0.0 | 0.0 |
| 2016 | 8694 | 0.0 | 0.0 | 0.0 |
| 2017 | 8720 | 0.0 | 0.0 | 0.0 |
| 2018 | 8615 | 0.0 | 0.0 | 0.0 |
| 2019 | 8706 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]