If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364223505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.132739,"lon":-113.041597,"icon":""}]} |
| Location: 00/05-35-036-22W4/0 | |
| Location Alias: 00/05-35-36-22 W4M | |
| Location Alias 2: 00/05-35-036-22 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 22 | |
| Section: 35 | |
| County/Municipality: Red Deer County | |
| Well Name: EMBER SD MIKWAN 5-35-36-22 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0421370 | |
| License Date: 2010-06-24 | |
| License Status: Issued | |
| Spud Date: 2010-08-28 | |
| Final Drill Date: 2010-08-28 | |
| Well Total Depth: 927.40 m | |
| Surface Hole Latitude: 52.132739 | |
| Surface Hole Longitude: -113.041597 |
| Date | Event |
|---|---|
| 2010-06-24 | Obtained License |
| 2010-08-28 | Direction Drilling Operation Performed - Deviate |
| 2010-08-28 | Finished Drilling |
| 2010-08-28 | Surface Casing Operation Performed |
| 2010-08-28 | Well Mode changed to Drilled and Cased |
| 2010-08-29 | Production Casing Operation Performed |
| 2010-08-29 | Rig Released |
| 2010-09-11 | Well Log Performed |
| 2010-10-02 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-26 | Perforation Treatment Performed - Fractured |
| 2010-11-30 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-11-30 | Well Mode changed to Testing |
| 2010-12-18 | Well Began Production |
| 2010-12-18 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-12-18 | Well Mode changed to Flowing |
| 2011-01-05 | Well Log Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2010-08-28 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-10-02 | Perforation | 377.40 | 381.40 | 13 |
| 2010-10-02 | Perforation | 352.50 | 353.50 | 13 |
| 2010-10-02 | Perforation | 317.80 | 318.80 | 13 |
| 2010-10-02 | Perforation | 308.60 | 309.60 | 13 |
| 2010-10-02 | Perforation | 415.30 | 417.30 | 13 |
| 2010-10-02 | Perforation | 515.50 | 516.50 | 13 |
| 2010-10-02 | Perforation | 492.90 | 493.90 | 13 |
| 2010-10-02 | Perforation | 840.00 | 841.00 | 13 |
| 2010-10-02 | Perforation | 793.30 | 795.30 | 13 |
| 2010-10-02 | Perforation | 484.90 | 486.90 | 13 |
| 2010-10-02 | Perforation | 421.40 | 422.40 | 13 |
| 2010-10-02 | Perforation | 373.60 | 375.60 | 13 |
| 2010-10-02 | Perforation | 434.20 | 436.20 | 13 |
| 2010-10-02 | Perforation | 464.80 | 465.80 | 13 |
| 2010-10-02 | Perforation | 481.90 | 482.90 | 13 |
| 2010-11-26 | Fracture | 840.00 | 841.00 | 0 |
| 2010-11-26 | Fracture | 363.50 | 364.50 | 0 |
| 2010-11-26 | Fracture | 399.30 | 401.30 | 0 |
| 2010-11-26 | Fracture | 296.80 | 353.50 | 0 |
| 2010-11-26 | Fracture | 793.30 | 795.30 | 0 |
| 2010-11-26 | Fracture | 515.50 | 516.50 | 0 |
| 2010-11-26 | Fracture | 365.70 | 388.20 | 0 |
| 2010-10-02 | Perforation | 365.70 | 367.70 | 13 |
| 2010-11-26 | Fracture | 408.70 | 493.90 | 0 |
| 2010-10-02 | Perforation | 414.00 | 415.00 | 13 |
| 2010-10-02 | Perforation | 408.70 | 409.70 | 13 |
| 2010-10-02 | Perforation | 386.20 | 388.20 | 13 |
| 2010-10-02 | Perforation | 296.80 | 297.80 | 13 |
| 2010-10-02 | Perforation | 399.30 | 401.30 | 13 |
| 2010-10-02 | Perforation | 363.50 | 364.50 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 336 | 0.0 | 0.0 | 0.0 |
| 2011 | 8696 | 0.0 | 0.0 | 0.0 |
| 2012 | 8644 | 0.0 | 0.0 | 0.0 |
| 2013 | 8737 | 0.0 | 0.0 | 0.0 |
| 2014 | 8700 | 0.0 | 0.0 | 0.0 |
| 2015 | 8711 | 0.0 | 0.0 | 0.0 |
| 2016 | 8694 | 0.0 | 0.0 | 0.0 |
| 2017 | 8720 | 0.0 | 0.0 | 0.0 |
| 2018 | 8615 | 0.0 | 0.0 | 0.0 |
| 2019 | 8706 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]