If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364230313000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.068888,"lon":-113.213192,"icon":""}]} |
| Location: 00/13-03-036-23W4/0 | |
| Location Alias: 00/13-03-36-23 W4M | |
| Location Alias 2: 00/13-03-036-23 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 23 | |
| Section: 03 | |
| County/Municipality: Red Deer County | |
| Well Name: EMBER MIKWAN 13-3-36-23 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0411671 | |
| License Date: 2009-07-30 | |
| License Status: Issued | |
| Spud Date: 2009-12-31 | |
| Final Drill Date: 2010-01-09 | |
| Well Total Depth: 847.00 m | |
| Surface Hole Latitude: 52.068888 | |
| Surface Hole Longitude: -113.213192 |
| Date | Event |
|---|---|
| 2009-07-30 | Obtained License |
| 2009-12-31 | Lost Circulation Occurred |
| 2009-12-31 | Surface Casing Operation Performed |
| 2010-01-09 | Finished Drilling |
| 2010-01-09 | Well Mode changed to Drilled and Cased |
| 2010-01-10 | Production Casing Operation Performed |
| 2010-01-10 | Rig Released |
| 2010-01-19 | Well Log Performed |
| 2010-02-01 | Perforation Treatment Performed - Jet Perforation |
| 2011-06-30 | Perforation Treatment Performed - Jet Perforation |
| 2011-08-03 | Perforation Treatment Performed - Fractured |
| 2016-11-12 | Well Log Performed |
| 2016-11-12 | Well Structure changed to Commingled |
| 2018-11-16 | Perforation Treatment Performed - Casing Patch (Over Perfs) |
| 2018-11-16 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-02-01 | Perforation | 809.50 | 812.00 | 13 |
| 2011-06-30 | Perforation | 404.50 | 405.50 | 13 |
| 2011-06-30 | Perforation | 412.10 | 413.10 | 13 |
| 2011-06-30 | Perforation | 448.00 | 450.00 | 13 |
| 2011-06-30 | Perforation | 503.90 | 506.40 | 13 |
| 2011-06-30 | Perforation | 515.10 | 516.60 | 13 |
| 2011-06-30 | Perforation | 280.00 | 282.50 | 13 |
| 2011-06-30 | Perforation | 496.00 | 497.00 | 13 |
| 2011-06-30 | Perforation | 456.50 | 458.50 | 13 |
| 2011-06-30 | Perforation | 458.50 | 460.50 | 13 |
| 2011-06-30 | Perforation | 481.50 | 482.50 | 13 |
| 2010-02-01 | Perforation | 720.00 | 722.00 | 13 |
| 2011-06-30 | Perforation | 530.20 | 530.70 | 13 |
| 2011-06-30 | Perforation | 534.50 | 535.00 | 13 |
| 2011-06-30 | Perforation | 537.50 | 538.50 | 13 |
| 2011-06-30 | Perforation | 797.90 | 798.40 | 13 |
| 2011-06-30 | Perforation | 800.30 | 800.80 | 13 |
| 2011-06-30 | Perforation | 805.40 | 806.40 | 13 |
| 2011-06-30 | Perforation | 259.00 | 259.50 | 13 |
| 2011-06-30 | Perforation | 331.80 | 333.30 | 13 |
| 2011-06-30 | Perforation | 342.60 | 343.60 | 13 |
| 2011-06-30 | Perforation | 301.80 | 302.30 | 13 |
| 2010-02-01 | Perforation | 705.00 | 706.00 | 13 |
| 2011-06-30 | Perforation | 299.00 | 300.00 | 13 |
| 2011-06-30 | Perforation | 268.90 | 269.40 | 13 |
| 2011-06-30 | Perforation | 296.50 | 297.00 | 13 |
| 2011-08-03 | Fracture | 280.00 | 282.50 | 0 |
| 2011-08-03 | Fracture | 259.00 | 516.60 | 0 |
| 2011-08-03 | Fracture | 530.20 | 538.50 | 0 |
| 2011-08-03 | Fracture | 797.90 | 800.80 | 0 |
| 2018-11-16 | Casing Patch | 578.00 | 579.00 | 0 |
| 2010-02-01 | Perforation | 578.00 | 579.00 | 13 |
| 2011-06-30 | Perforation | 421.90 | 422.40 | 13 |
| 2011-06-30 | Perforation | 433.70 | 434.70 | 13 |
| 2011-06-30 | Perforation | 443.70 | 444.70 | 13 |
| 2011-06-30 | Perforation | 418.00 | 419.50 | 13 |
| 2011-06-30 | Perforation | 397.20 | 398.20 | 13 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2009-12-31 | Lost Circulation | 16.00 | 19.00 |
| 2016-11-12 | No Incident Encountered | 0.00 | 0.00 |
| 2018-11-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]