X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364230914000

Well Details

Well ID: 0364230914000
Loading map...
Location: 00/14-09-036-23W4/0
Location Alias: 00/14-09-36-23 W4M
Location Alias 2: 00/14-09-036-23 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 23
Section: 09
County/Municipality: Red Deer County
Well Name: EMBER MIKWAN 14-9-36-23
Operator Name: Ember Resources Inc.
License Number: 0352257
License Date: 2006-02-17
License Status: Issued
Spud Date: 2006-03-02
Final Drill Date: 2006-03-06
Well Total Depth: 915.00 m
Surface Hole Latitude: 52.083938
Surface Hole Longitude: -113.233022

For data sources see[1][2]

Well History

Date Event
2006-02-17 Obtained License
2006-03-02 Surface Casing Operation Performed
2006-03-05 Lost Circulation Occurred
2006-03-06 Finished Drilling
2006-03-06 Production Casing Operation Performed
2006-03-06 Rig Released
2006-03-06 Well Mode changed to Drilled and Cased
2006-03-08 Well Log Performed
2006-05-14 Perforation Treatment Performed - Jet Perforation
2006-05-24 Perforation Treatment Performed - Jet Perforation
2006-06-14 Perforation Treatment Performed - Fractured
2006-06-19 Well Fluid changed to Coalbed Methane-Coals and Other
2006-06-19 Well Mode changed to Testing
2006-12-21 Well Began Production
2006-12-21 Well Fluid changed to Coalbed Methane-Coals and Other
2006-12-21 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-05-14 Perforation 645.00 647.00 20
2006-05-24 Perforation 506.80 507.80 13
2006-05-24 Perforation 487.90 488.90 13
2006-05-24 Perforation 477.50 478.50 13
2006-05-24 Perforation 470.80 471.80 13
2006-05-24 Perforation 464.70 465.70 13
2006-05-24 Perforation 458.60 459.60 13
2006-05-24 Perforation 453.70 454.70 13
2006-05-24 Perforation 450.40 451.40 13
2006-05-24 Perforation 441.20 442.20 13
2006-05-24 Perforation 395.40 396.40 13
2006-05-24 Perforation 591.00 592.00 13
2006-05-24 Perforation 367.00 368.00 13
2006-05-24 Perforation 365.10 366.10 13
2006-05-24 Perforation 362.70 363.70 13
2006-05-24 Perforation 355.70 356.70 13
2006-05-24 Perforation 334.50 335.50 13
2006-06-14 Fracture 334.50 592.00 0
2006-05-24 Perforation 576.50 579.50 13
2006-05-24 Perforation 566.40 567.40 13
2006-05-24 Perforation 563.50 564.50 13
2006-05-24 Perforation 555.00 556.00 13
2006-05-24 Perforation 542.60 543.60 13
2006-05-24 Perforation 518.00 521.00 13
2006-05-24 Perforation 509.50 510.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 336 0.0 0.0 0.0
2007 1634 0.0 0.0 0.0
2008 5867 0.0 0.0 0.0
2009 8725 0.0 0.0 0.0
2010 8581 0.0 0.0 0.0
2011 8535 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 8708 0.0 0.0 0.0
2015 8746 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2006-03-05 Lost Circulation 100.00 915.00

For data sources see[6]

References