If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364231014000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.083568,"lon":-113.208334,"icon":""}]} |
| Location: 00/14-10-036-23W4/0 | |
| Location Alias: 00/14-10-36-23 W4M | |
| Location Alias 2: 00/14-10-036-23 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 23 | |
| Section: 10 | |
| County/Municipality: Red Deer County | |
| Well Name: EMBER ET AL MIKWAN 14-10-36-23 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0410592 | |
| License Date: 2009-05-25 | |
| License Status: Issued | |
| Spud Date: 2009-08-27 | |
| Final Drill Date: 2009-09-06 | |
| Well Total Depth: 906.00 m | |
| Surface Hole Latitude: 52.083568 | |
| Surface Hole Longitude: -113.208334 |
| Date | Event |
|---|---|
| 2009-05-25 | Obtained License |
| 2009-08-27 | Lost Circulation Occurred |
| 2009-08-27 | Surface Casing Operation Performed |
| 2009-09-06 | Finished Drilling |
| 2009-09-06 | Production Casing Operation Performed |
| 2009-09-06 | Rig Released |
| 2009-09-06 | Well Mode changed to Drilled and Cased |
| 2009-09-14 | Well Log Performed |
| 2009-10-29 | Perforation Treatment Performed - Jet Perforation |
| 2009-11-01 | Perforation Treatment Performed - Fractured |
| 2009-11-05 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2009-11-05 | Well Mode changed to Testing |
| 2009-11-11 | Well Began Production |
| 2009-11-11 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2009-11-11 | Well Mode changed to Flowing |
| 2010-01-28 | Well Log Performed |
| 2015-08-04 | Perforation Treatment Performed - Jet Perforation |
| 2015-08-04 | Well Log Performed |
| 2016-08-30 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2009-10-29 | Perforation | 858.90 | 859.90 | 13 |
| 2009-10-29 | Perforation | 546.30 | 546.80 | 13 |
| 2009-10-29 | Perforation | 533.00 | 533.50 | 13 |
| 2009-10-29 | Perforation | 525.30 | 525.80 | 13 |
| 2009-10-29 | Perforation | 507.10 | 509.60 | 13 |
| 2009-10-29 | Perforation | 505.00 | 506.50 | 13 |
| 2009-10-29 | Perforation | 498.10 | 501.10 | 13 |
| 2009-10-29 | Perforation | 496.90 | 497.40 | 13 |
| 2009-10-29 | Perforation | 484.70 | 485.20 | 13 |
| 2009-10-29 | Perforation | 480.80 | 481.30 | 13 |
| 2009-10-29 | Perforation | 473.90 | 474.90 | 13 |
| 2009-10-29 | Perforation | 854.00 | 855.00 | 13 |
| 2009-10-29 | Perforation | 472.00 | 472.50 | 13 |
| 2009-10-29 | Perforation | 463.80 | 464.30 | 13 |
| 2009-10-29 | Perforation | 455.60 | 457.10 | 13 |
| 2009-10-29 | Perforation | 448.10 | 449.10 | 13 |
| 2009-10-29 | Perforation | 446.20 | 446.70 | 13 |
| 2009-10-29 | Perforation | 442.50 | 443.00 | 13 |
| 2009-10-29 | Perforation | 431.10 | 432.10 | 13 |
| 2009-10-29 | Perforation | 428.90 | 429.40 | 13 |
| 2009-10-29 | Perforation | 401.00 | 402.00 | 13 |
| 2009-10-29 | Perforation | 392.50 | 393.00 | 13 |
| 2009-10-29 | Perforation | 587.50 | 588.00 | 13 |
| 2009-10-29 | Perforation | 386.40 | 386.90 | 13 |
| 2009-10-29 | Perforation | 355.20 | 355.70 | 13 |
| 2009-10-29 | Perforation | 352.80 | 353.80 | 13 |
| 2009-10-29 | Perforation | 343.30 | 343.80 | 13 |
| 2009-10-29 | Perforation | 308.90 | 309.40 | 13 |
| 2009-11-01 | Fracture | 854.00 | 859.90 | 0 |
| 2009-11-01 | Fracture | 525.30 | 569.00 | 0 |
| 2009-11-01 | Fracture | 496.90 | 509.60 | 0 |
| 2009-11-01 | Fracture | 442.50 | 485.20 | 0 |
| 2009-11-01 | Fracture | 386.40 | 432.10 | 0 |
| 2009-10-29 | Perforation | 584.00 | 586.00 | 13 |
| 2009-11-01 | Fracture | 308.90 | 355.70 | 0 |
| 2015-08-04 | Perforation | 842.50 | 845.00 | 13 |
| 2009-10-29 | Perforation | 581.80 | 582.30 | 13 |
| 2009-10-29 | Perforation | 567.00 | 569.00 | 13 |
| 2009-10-29 | Perforation | 565.30 | 565.80 | 13 |
| 2009-10-29 | Perforation | 555.40 | 556.90 | 13 |
| 2009-10-29 | Perforation | 553.70 | 554.20 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 769 | 0.0 | 0.0 | 0.0 |
| 2010 | 8652 | 0.0 | 0.0 | 0.0 |
| 2011 | 8617 | 0.0 | 0.0 | 0.0 |
| 2012 | 8783 | 0.0 | 0.0 | 0.0 |
| 2013 | 8751 | 0.0 | 0.0 | 0.0 |
| 2014 | 8707 | 0.0 | 0.0 | 0.0 |
| 2015 | 8746 | 0.0 | 0.0 | 0.0 |
| 2016 | 8759 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2009-08-27 | Lost Circulation | 11.00 | 12.00 |
| 2015-08-04 | No Incident Encountered | 0.00 | 0.00 |
| 2016-08-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]