If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0364281416000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.09638,"lon":-113.890705,"icon":""}]} |
| Location: 00/16-14-036-28W4/0 | |
| Location Alias: 00/16-14-36-28 W4M | |
| Location Alias 2: 00/16-14-036-28 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 4 | |
| Range: 28 | |
| Section: 14 | |
| County/Municipality: Red Deer County | |
| Well Name: VECL ET AL PENHOLD 16-14-36-28 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0098113 | |
| License Date: 1982-10-20 | |
| License Status: RecCertified | |
| Spud Date: 1982-10-19 | |
| Final Drill Date: 1982-10-29 | |
| Well Total Depth: 2015.00 m | |
| Surface Hole Latitude: 52.096380 | |
| Surface Hole Longitude: -113.890705 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1982-10-20 | Obtained License |
| 1982-10-24 | Drill Stem Test Performed |
| 1982-10-29 | Finished Drilling |
| 1982-10-29 | Well Log Performed |
| 1982-10-29 | Well Mode changed to Drilled and Cased |
| 1982-10-30 | Drill Stem Test Performed |
| 1982-11-01 | Production Casing Operation Performed |
| 1982-11-06 | Perforation Treatment Performed - Jet Perforation |
| 1982-11-22 | Well Began Production |
| 1982-11-22 | Well Fluid changed to Crude Oil |
| 1982-11-22 | Well Mode changed to Pumping |
| 1987-06-15 | Well Fluid changed to Crude Oil |
| 1987-06-15 | Well Mode changed to Suspended |
| 1987-06-16 | Perforation Treatment Performed - Jet Perforation |
| 1987-06-16 | Well Log Performed |
| 1987-06-17 | Perforation Treatment Performed - Fractured |
| 1994-10-04 | Well Log Performed |
| 1994-10-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-10-06 | Perforation Treatment Performed - Jet Perforation |
| 1994-10-06 | Perforation Treatment Performed - Remedial Casing |
| 1994-10-06 | Plug Back Performed |
| 1994-10-06 | Well Abandoned |
| 1994-10-06 | Well Fluid changed to Crude Oil |
| 1994-10-06 | Well Log Performed |
| 1994-10-06 | Well Mode changed to Abandoned Zone |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1982-11-06 | Perforation | 1700.40 | 1701.50 | 13 |
| 1982-11-06 | Perforation | 1703.00 | 1703.60 | 13 |
| 1987-06-16 | Perforation | 1720.00 | 1724.50 | 13 |
| 1987-06-17 | Fracture | 1720.00 | 1724.50 | 0 |
| 1994-10-06 | Packing Device Capped w/Cement | 1620.00 | 1628.00 | 0 |
| 1994-10-06 | Perforation | 286.00 | 287.00 | 13 |
| 1994-10-06 | Remedial Casing Cementing | 286.00 | 287.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1982 | 573 | 0.0 | 0.0 | 0.0 |
| 1983 | 3267 | 0.0 | 0.0 | 0.0 |
| 1984 | 2218 | 0.0 | 0.0 | 0.0 |
| 1985 | 828 | 0.0 | 0.0 | 0.0 |
| 1986 | 1102 | 0.0 | 0.0 | 0.0 |
| 1987 | 904 | 0.0 | 0.0 | 0.0 |
For data sources see[5]