X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0364283305000

Well Details

Well ID: 0364283305000
Loading map...
Location: 00/05-33-036-28W4/0
Location Alias: 00/05-33-36-28 W4M
Location Alias 2: 00/05-33-036-28 W4/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 28
Section: 33
County/Municipality: Red Deer County
Well Name: Vantage PENHOLD 5-33-36-28
Operator Name: Vantage Point Resources Inc.
License Number: 0015420
License Date: 1958-06-18
License Status: Suspension
Spud Date: 1958-06-18
Final Drill Date: 1958-07-23
Well Total Depth: 2139.70 m
Surface Hole Latitude: 52.134812
Surface Hole Longitude: -113.953678

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-06-18 Obtained License
1958-07-05 Drill Stem Test Performed
1958-07-23 Drill Stem Test Performed
1958-07-23 Finished Drilling
1958-07-25 Production Casing Operation Performed
1958-08-04 Perforation Treatment Performed - Bullet Perforation
1958-08-07 Perforation Treatment Performed - Fractured
1958-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-09-01 Perforation Treatment Performed - Jet Perforation
1958-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-09-16 Perforation Treatment Performed - Acid Wash - No Pressure
1958-09-16 Perforation Treatment Performed - Jet Perforation
1958-10-31 Well Mode changed to Drilled and Cased
2000-11-12 Well Began Production
2000-11-12 Well Fluid changed to Gas
2000-11-12 Well Mode changed to Flowing
2002-10-31 Well Fluid changed to Gas
2002-10-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-08-04 Bullet Perforation 1926.00 1926.90 13
1958-09-01 Acid Treatment 1693.20 1699.90 0
1958-09-16 Perforation 1709.90 1710.80 13
1958-09-16 Perforation 1712.10 1713.30 13
1958-09-16 Perforation 1714.20 1715.40 13
1958-09-16 Acid Wash 1709.90 1715.40 0
1958-09-16 Acid Treatment 1709.90 1715.40 0
1958-08-04 Bullet Perforation 1925.10 1925.70 13
1958-08-04 Bullet Perforation 1923.90 1924.50 13
1958-08-04 Bullet Perforation 1921.80 1922.70 13
1958-08-07 Fracture 1921.80 1926.90 0
1958-09-01 Packing Device Capped w/Cement 1735.80 1746.50 0
1958-09-01 Perforation 1693.20 1694.40 13
1958-09-01 Perforation 1696.50 1697.70 13
1958-09-01 Perforation 1698.70 1699.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 1031 0.0 0.0 0.0
2001 2615 0.0 0.0 0.0
2002 3194 0.0 0.0 0.0

For data sources see[5]

References