X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365011014002

Well Details

Well ID: 0365011014002
Loading map...
Location: 00/14-10-036-01W5/2
Location Alias: 00/14-10-36-01 W5M
Location Alias 2: 00/14-10-036-01 W5/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 01
Section: 10
County/Municipality: Red Deer County
Well Name: CHAMAELO EXP TINDA 14-10-36-1
Operator Name: Summerland Energy Inc.
License Number: 0086577
License Date: 1980-10-24
License Status: Issued
Spud Date: 1980-10-31
Final Drill Date: 1980-11-14
Well Total Depth: 2107.00 m
Surface Hole Latitude: 52.082997
Surface Hole Longitude: -114.067083

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-24 Obtained License
1980-11-14 Finished Drilling
1980-11-14 Well Log Performed
1980-11-14 Well Mode changed to Drilled and Cased
1980-11-16 Drill Stem Test Performed
1980-11-16 Well Log Performed
1980-11-17 Drill Stem Test Performed
1980-11-18 Drill Stem Test Performed
1980-11-20 Production Casing Operation Performed
1980-12-03 Perforation Treatment Performed - Jet Perforation
1980-12-05 Perforation Treatment Performed - Fractured
1980-12-11 Perforation Treatment Performed - Jet Perforation
1980-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-20 Perforation Treatment Performed - Jet Perforation
1981-06-20 Well Log Performed
1981-06-23 Perforation Treatment Performed - Fractured
1981-06-23 Well Began Production
1981-06-23 Well Fluid changed to Crude Oil
1981-06-23 Well Mode changed to Flowing
1981-07-30 Well Fluid changed to Crude Oil
1981-07-30 Well Mode changed to Pumping
1998-04-01 Well Fluid changed to Crude Oil
1998-04-01 Well Mode changed to Suspended
1999-08-12 Well Fluid changed to Crude Oil
1999-08-12 Well Mode changed to Pumping
2004-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-08-14 Plug Back Performed
2004-08-15 Perforation Treatment Performed - Jet Perforation
2008-03-06 Well Log Performed
2008-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-07 Plug Back Performed
2008-03-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-03 Perforation 2085.00 2090.00 7
2004-08-15 Perforation 1798.00 1804.00 17
2008-03-07 Packing Device Capped w/Cement 1784.00 1792.00 0
1980-12-05 Fracture 2085.00 2090.00 0
1980-12-11 Perforation 2066.00 2070.00 7
1980-12-11 Perforation 2071.50 2072.70 7
1980-12-11 Perforation 2074.50 2076.00 7
1980-12-12 Acid Treatment 2066.00 2090.00 0
1981-06-20 Perforation 1171.00 1175.00 13
1981-06-23 Fracture 1171.00 1175.00 0
2004-08-14 Packing Device Capped w/Cement 2051.10 2059.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 3899 0.0 0.0 0.0
1982 7234 0.0 0.0 0.0
1983 8057 0.0 0.0 0.0
1984 8675 0.0 0.0 0.0
1985 8466 0.0 0.0 0.0
1986 8366 0.0 0.0 0.0
1987 8652 0.0 0.0 0.0
1988 8685 0.0 0.0 0.0
1989 8759 0.0 0.0 0.0
1990 8757 0.0 0.0 0.0
1991 8699 0.0 0.0 0.0
1992 8757 0.0 0.0 0.0
1993 8737 0.0 0.0 0.0
1994 8699 0.0 0.0 0.0
1995 8015 0.0 0.0 0.0
1996 8591 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 1608 0.0 0.0 0.0
1999 2568 0.0 0.0 0.0
2000 8775 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8711 0.0 0.0 0.0
2003 8735 0.0 0.0 0.0
2004 6863 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8711 0.0 0.0 0.0
2007 8591 0.0 0.0 0.0
2008 7536 0.0 0.0 0.0
2009 8472 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8615 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 7549 0.0 0.0 0.0
2015 8579 0.0 0.0 0.0
2016 8735 0.0 0.0 0.0
2017 8359 0.0 0.0 0.0
2018 8756 0.0 0.0 0.0
2019 8644 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References