If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0365011514032 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.085492,"lon":-114.071801,"icon":""}]} |
| Location: 03/14-15-036-01W5/2 | |
| Location Alias: 03/14-15-36-01 W5M | |
| Location Alias 2: 03/14-15-036-01 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 5 | |
| Range: 01 | |
| Section: 15 | |
| County/Municipality: Red Deer County | |
| Well Name: SUMMERLAND HZ TINDA 14-15-36-1 | |
| Operator Name: Summerland Energy Inc. | |
| License Number: 0470343 | |
| License Date: 2014-10-01 | |
| License Status: Amended | |
| Spud Date: 2014-10-21 | |
| Final Drill Date: 2014-11-04 | |
| Well Total Depth: 2774.00 m | |
| Surface Hole Latitude: 52.085492 | |
| Surface Hole Longitude: -114.071801 |
| Date | Event |
|---|---|
| 2014-10-01 | Obtained License |
| 2014-10-21 | Surface Casing Operation Performed |
| 2014-10-23 | Direction Drilling Operation Performed - Deviate |
| 2014-10-24 | Direction Drilling Operation Performed - Horizontal |
| 2014-10-25 | Intermediate Casing Operation Performed |
| 2014-10-31 | Direction Drilling Operation Performed - Horizontal |
| 2014-11-04 | Finished Drilling |
| 2014-11-04 | Well Mode changed to Drilled and Cased |
| 2014-11-06 | Liner Casing Operation Performed |
| 2014-11-07 | Rig Released |
| 2014-11-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-11-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-12-01 | Well Began Production |
| 2014-12-01 | Well Fluid changed to Crude Oil |
| 2014-12-01 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-10-23 | 926.30 | Deviate (5 - 79 degrees) |
| 2014-10-24 | 1277.00 | Horizontal |
| 2014-10-31 | 1824.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-11-16 | Multi-Stage Fracture | 2737.30 | 2737.40 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 2206.00 | 2206.10 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 2146.90 | 2147.00 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 2087.90 | 2088.00 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 2028.80 | 2028.90 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1969.60 | 1969.70 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1910.50 | 1910.60 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1852.60 | 1852.70 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1793.50 | 1793.60 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1734.40 | 1734.50 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1675.30 | 1675.40 | 0 |
| 2014-11-16 | Multi-Stage Fracture | 2678.40 | 2678.50 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1616.20 | 1616.30 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1557.10 | 1557.20 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1498.10 | 1498.20 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1439.20 | 1439.30 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1394.10 | 1394.20 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 1348.70 | 1348.80 | 0 |
| 2014-11-16 | Multi-Stage Fracture | 2619.40 | 2619.50 | 0 |
| 2014-11-16 | Multi-Stage Fracture | 2560.50 | 2560.60 | 0 |
| 2014-11-16 | Multi-Stage Fracture | 2501.40 | 2501.50 | 0 |
| 2014-11-16 | Multi-Stage Fracture | 2442.30 | 2442.40 | 0 |
| 2014-11-16 | Multi-Stage Fracture | 2383.20 | 2383.30 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 2324.10 | 2324.20 | 0 |
| 2014-11-17 | Multi-Stage Fracture | 2265.10 | 2265.20 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-11-16 | 2014-11-17 | 1,175 | 808 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 71.7144 | N/A | |||
| Sand (20/40) | Canyon | Aluminum Oxide | 1344-28-1 | 100 | 22.5484 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 22.5484 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 22.5484 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 22.5484 | N/A | ||||
| Tolcide PS75LT | Canyon | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0128 | N/A | |
| Water | 7732-18-5 | 100 | 0.0128 | N/A | ||||
| CAN-2310 Breaker (Enzyme LpH. 50L:1L) | Canyon | Breaker | Ethylene Glycol | 107-21-1 | 100 | 0.0717 | N/A | |
| Water | 7732-18-5 | 100 | 0.0717 | N/A | ||||
| CAN-1636 pH Buffer (LpH) | Canyon | Buffer | Acetic Acid | 64-19-7 | 100 | 0.1424 | N/A | |
| Water | 7732-18-5 | 100 | 0.1424 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.0788 | N/A | |
| Water | 7732-18-5 | 100 | 0.0788 | N/A | ||||
| CAN-2210 Crosslinker (Zirconate) | Canyon | Crosslinker | Methyl Alcohol | 67-56-1 | 100 | 0.0797 | N/A | |
| n-propyl alcohol | 71-23-8 | 100 | 0.0797 | N/A | ||||
| Nitrogen Gas | Canyon | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 4.9546 | N/A | |
| Non-hazardous base ingredient(s) | Not Available | 100 | 4.9546 | N/A | ||||
| CAN-2010 Gellant (CMHPG) | Canyon | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.3086 | N/A | |
| CAN-1402 Scale Inhibitor | Canyon | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0176 | N/A | |
| Potassium Chloride | 7447-40-7 | 100 | 0.0176 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0176 | N/A | ||||
| CAN-2403 nanoFLO | Canyon | Surfactant | Ethanol | 64-17-5 | 100 | 0.0705 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0705 | N/A | ||||
| Terpenes and Terpenoids. sweet orange-oil | 68647-72-3 | 100 | 0.0705 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0705 | N/A |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 727 | 0.0 | 0.0 | 0.0 |
| 2015 | 7867 | 0.0 | 0.0 | 0.0 |
| 2016 | 8711 | 0.0 | 0.0 | 0.0 |
| 2017 | 8609 | 0.0 | 0.0 | 0.0 |
| 2018 | 8628 | 0.0 | 0.0 | 0.0 |
| 2019 | 8665 | 0.0 | 0.0 | 0.0 |
| 2020 | 2115 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-11-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]