If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0365021714000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.099717,"lon":-114.256146,"icon":""}]} |
| Location: 00/14-17-036-02W5/0 | |
| Location Alias: 00/14-17-36-02 W5M | |
| Location Alias 2: 00/14-17-036-02 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 5 | |
| Range: 02 | |
| Section: 17 | |
| County/Municipality: Red Deer County | |
| Well Name: CVE MARKER 14-17-36-2 | |
| Operator Name: Cenovus Energy Inc. | |
| License Number: 0144766 | |
| License Date: 1990-07-12 | |
| License Status: RecCertified | |
| Spud Date: 1990-07-22 | |
| Final Drill Date: 1990-08-02 | |
| Well Total Depth: 2254.00 m | |
| Surface Hole Latitude: 52.099717 | |
| Surface Hole Longitude: -114.256146 |
| Date | Event |
|---|---|
| 1990-07-12 | Obtained License |
| 1990-07-22 | Surface Casing Operation Performed |
| 1990-08-02 | Finished Drilling |
| 1990-08-02 | Well Log Performed |
| 1990-08-03 | Well Log Performed |
| 1990-08-04 | Production Casing Operation Performed |
| 1990-08-05 | Rig Released |
| 1990-08-22 | Well Log Performed |
| 1990-08-23 | Perforation Treatment Performed - Fractured |
| 1990-08-23 | Perforation Treatment Performed - Jet Perforation |
| 1990-08-23 | Well Log Performed |
| 1990-09-11 | Well Mode changed to Drilled and Cased |
| 1991-02-25 | Well Began Production |
| 1991-02-25 | Well Fluid changed to Gas |
| 1991-02-25 | Well Mode changed to Flowing |
| 1994-11-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-11-17 | Perforation Treatment Performed - Jet Perforation |
| 1994-11-17 | Perforation Treatment Performed - Remedial Casing |
| 1994-11-17 | Plug Back Performed |
| 1994-11-17 | Well Fluid changed to Gas |
| 1994-11-17 | Well Log Performed |
| 1994-11-17 | Well Mode changed to Abandoned |
| 1994-11-30 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1990-08-23 | Perforation | 1920.00 | 1922.00 | 13 |
| 1990-08-23 | Fracture | 1920.00 | 1922.00 | 0 |
| 1994-11-17 | Packing Device Capped w/Cement | 1899.00 | 1907.00 | 0 |
| 1994-11-17 | Perforation | 335.00 | 336.00 | 13 |
| 1994-11-17 | Remedial Casing Cementing | 335.00 | 336.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1990 | 91 | 0.0 | 0.0 | 0.0 |
| 1991 | 2772 | 0.0 | 0.0 | 0.0 |
| 1992 | 1267 | 0.0 | 0.0 | 0.0 |
| 1993 | 10 | 0.0 | 0.0 | 0.0 |
For data sources see[5]