If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0365030816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.071175,"lon":-114.385722,"icon":""}]} |
| Location: 00/16-08-036-03W5/0 | |
| Location Alias: 00/16-08-36-03 W5M | |
| Location Alias 2: 00/16-08-036-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 036 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 08 | |
| County/Municipality: Red Deer County | |
| Well Name: WHITECAP HZ GARR 16-8-36-3 | |
| Operator Name: Whitecap Resources Inc. | |
| License Number: 0434981 | |
| License Date: 2011-07-07 | |
| License Status: Issued | |
| Spud Date: 2011-07-26 | |
| Final Drill Date: 2011-08-07 | |
| Well Total Depth: 3321.00 m | |
| Surface Hole Latitude: 52.071175 | |
| Surface Hole Longitude: -114.385722 |
| Date | Event |
|---|---|
| 2011-07-07 | Obtained License |
| 2011-07-29 | Surface Casing Operation Performed |
| 2011-08-01 | Direction Drilling Operation Performed - Horizontal |
| 2011-08-03 | Well Log Performed |
| 2011-08-07 | Finished Drilling |
| 2011-08-07 | Well Log Performed |
| 2011-08-07 | Well Mode changed to Drilled and Cased |
| 2011-08-08 | Production Casing Operation Performed |
| 2011-08-10 | Rig Released |
| 2011-08-12 | Well Log Performed |
| 2011-08-17 | Perforation Treatment Performed - Jet Perforation |
| 2011-08-21 | Perforation Treatment Performed - Jet Perforation |
| 2011-08-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-08-22 | Perforation Treatment Performed - Jet Perforation |
| 2011-08-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-08-23 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-09-06 | Well Began Production |
| 2011-09-06 | Well Fluid changed to Crude Oil |
| 2011-09-06 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-08-01 | 1429.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-08-17 | Perforation | 3275.00 | 3275.50 | 3 |
| 2011-08-21 | Multi-Stage Fracture | 3140.00 | 3140.50 | 0 |
| 2011-08-21 | Multi-Stage Fracture | 3070.00 | 3070.50 | 0 |
| 2011-08-21 | Multi-Stage Fracture | 3000.00 | 3000.50 | 0 |
| 2011-08-21 | Multi-Stage Fracture | 2930.00 | 2930.50 | 0 |
| 2011-08-21 | Multi-Stage Fracture | 2860.00 | 2860.50 | 0 |
| 2011-08-21 | Perforation | 2805.00 | 2805.50 | 3 |
| 2011-08-21 | Perforation | 2735.00 | 2735.50 | 3 |
| 2011-08-21 | Perforation | 2665.00 | 2665.50 | 3 |
| 2011-08-21 | Perforation | 2595.00 | 2595.50 | 3 |
| 2011-08-21 | Perforation | 2525.00 | 2525.50 | 3 |
| 2011-08-17 | Perforation | 3210.00 | 3210.50 | 3 |
| 2011-08-21 | Perforation | 2455.00 | 2455.50 | 3 |
| 2011-08-22 | Multi-Stage Fracture | 2805.00 | 2805.50 | 0 |
| 2011-08-22 | Multi-Stage Fracture | 2735.00 | 2735.50 | 0 |
| 2011-08-22 | Multi-Stage Fracture | 2665.00 | 2665.50 | 0 |
| 2011-08-22 | Multi-Stage Fracture | 2595.00 | 2595.50 | 0 |
| 2011-08-22 | Multi-Stage Fracture | 2525.00 | 2525.50 | 0 |
| 2011-08-22 | Multi-Stage Fracture | 2455.00 | 2455.50 | 0 |
| 2011-08-22 | Perforation | 2385.00 | 2385.50 | 3 |
| 2011-08-22 | Perforation | 2315.00 | 2315.50 | 3 |
| 2011-08-22 | Perforation | 2245.00 | 2245.50 | 3 |
| 2011-08-17 | Perforation | 3140.00 | 3140.50 | 3 |
| 2011-08-22 | Perforation | 2165.00 | 2165.50 | 3 |
| 2011-08-22 | Perforation | 1958.00 | 1958.50 | 3 |
| 2011-08-22 | Perforation | 1902.00 | 1902.50 | 3 |
| 2011-08-23 | Multi-Stage Fracture | 2385.00 | 2385.50 | 0 |
| 2011-08-23 | Multi-Stage Fracture | 2315.00 | 2315.50 | 0 |
| 2011-08-23 | Multi-Stage Fracture | 2245.00 | 2245.50 | 0 |
| 2011-08-23 | Multi-Stage Fracture | 2165.00 | 2165.50 | 0 |
| 2011-08-23 | Multi-Stage Fracture | 1958.00 | 1958.50 | 0 |
| 2011-08-23 | Multi-Stage Fracture | 1902.00 | 1902.50 | 0 |
| 2011-08-17 | Perforation | 3070.00 | 3070.50 | 3 |
| 2011-08-17 | Perforation | 3000.00 | 3000.50 | 3 |
| 2011-08-17 | Perforation | 2930.00 | 2930.50 | 3 |
| 2011-08-17 | Perforation | 2860.00 | 2860.50 | 3 |
| 2011-08-21 | Multi-Stage Fracture | 3275.00 | 3275.50 | 0 |
| 2011-08-21 | Multi-Stage Fracture | 3210.00 | 3210.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 2573 | 0.0 | 0.0 | 0.0 |
| 2012 | 8783 | 0.0 | 0.0 | 0.0 |
| 2013 | 8663 | 0.0 | 0.0 | 0.0 |
| 2014 | 8719 | 0.0 | 0.0 | 0.0 |
| 2015 | 8653 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8663 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8614 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]