X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365032507002

Well Details

Well ID: 0365032507002
Loading map...
Location: 00/07-25-036-03W5/2
Location Alias: 00/07-25-36-03 W5M
Location Alias 2: 00/07-25-036-03 W5/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 03
Section: 25
County/Municipality: Red Deer County
Well Name: OMERS ENERGY LANAWAY 7-25-36-3
Operator Name: Gain Energy Ltd.
License Number: 0092083
License Date: 1981-09-03
License Status: Suspension
Spud Date: 1981-09-18
Final Drill Date: 1981-10-02
Well Total Depth: 2300.00 m
Surface Hole Latitude: 52.120380
Surface Hole Longitude: -114.295597

For data sources see[1][2]

Well History

Date Event
1981-09-03 Obtained License
1981-10-02 Finished Drilling
1981-10-02 Well Log Performed
1981-10-02 Well Mode changed to Drilled and Cased
1981-10-05 Drill Stem Test Performed
1981-10-06 Production Casing Operation Performed
1982-02-18 Perforation Treatment Performed - Jet Perforation
1982-08-10 Perforation Treatment Performed - Jet Perforation
1987-05-26 Well Began Production
1987-05-26 Well Fluid changed to Gas
1987-05-26 Well Mode changed to Flowing
1987-05-27 Perforation Treatment Performed - Jet Perforation
1987-05-28 Perforation Treatment Performed - Fractured
1991-02-03 Well Structure changed to Commingled
1994-11-11 Well Fluid changed to Gas
1994-11-11 Well Mode changed to Flowing
1995-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-24 Plug Back Performed
1995-06-24 Well Fluid changed to Gas
1995-06-24 Well Mode changed to Flowing
1995-06-28 Perforation Treatment Performed - Fractured
2011-08-01 Well Fluid changed to Gas
2011-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-02-18 Perforation 2255.50 2266.50 13
1982-02-18 Perforation 2270.00 2276.50 13
1982-08-10 Perforation 2243.00 2247.00 13
1987-05-27 Perforation 2176.00 2179.00 13
1987-05-28 Fracture 2176.00 2179.00 0
1995-06-24 Packing Device Capped w/Cement 2225.00 2233.00 0
1995-06-28 Fracture 2176.00 2179.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 4241 0.0 0.0 0.0
1988 4635 0.0 0.0 0.0
1989 7667 0.0 0.0 0.0
1990 4895 0.0 0.0 0.0
1991 213 0.0 0.0 0.0
1994 1218 0.0 0.0 0.0
1995 6368 0.0 0.0 0.0
1996 8289 0.0 0.0 0.0
1997 7691 0.0 0.0 0.0
1998 7455 0.0 0.0 0.0
1999 6692 0.0 0.0 0.0
2000 5743 0.0 0.0 0.0
2001 7853 0.0 0.0 0.0
2002 8202 0.0 0.0 0.0
2003 7854 0.0 0.0 0.0
2004 8516 0.0 0.0 0.0
2005 8300 0.0 0.0 0.0
2006 8013 0.0 0.0 0.0
2007 8695 0.0 0.0 0.0
2008 6131 0.0 0.0 0.0
2009 3374 0.0 0.0 0.0

For data sources see[5]

References