X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365033107002

Well Details

Well ID: 0365033107002
Loading map...
Location: 00/07-31-036-03W5/2
Location Alias: 00/07-31-36-03 W5M
Location Alias 2: 00/07-31-036-03 W5/02
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 03
Section: 31
County/Municipality: Red Deer County
Well Name: WHITECAP GARR 7-31-36-3
Operator Name: Whitecap Resources Inc.
License Number: 0026157
License Date: 1964-05-27
License Status: Abandoned
Spud Date: 1964-06-05
Final Drill Date: 1964-07-18
Well Total Depth: 2945.90 m
Surface Hole Latitude: 52.135331
Surface Hole Longitude: -114.415703

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-05-27 Obtained License
1964-06-07 Lost Circulation Occurred
1964-06-22 Drill Stem Test Performed
1964-07-16 Drill Stem Test Performed
1964-07-17 Drill Stem Test Performed
1964-07-18 Drill Stem Test Performed
1964-07-18 Finished Drilling
1964-07-18 Well Mode changed to Drilled and Cased
1964-07-22 Drill Stem Test Performed
1964-07-25 Production Casing Operation Performed
1964-07-26 Perforation Treatment Performed - Acid Wash - No Pressure
1964-07-26 Perforation Treatment Performed - Jet Perforation
1969-03-11 Perforation Treatment Performed - Abrasa-Jet Perforation
1969-03-12 Perforation Treatment Performed - Cement Squeeze
1969-03-15 Perforation Treatment Performed - Jet Perforation
1969-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-01-07 Plug Back Performed
1991-02-20 Well Log Performed
1991-07-04 Perforation Treatment Performed - Fractured
1991-07-04 Perforation Treatment Performed - Jet Perforation
1991-07-09 Well Began Production
1991-07-09 Well Fluid changed to Crude Oil
1991-07-09 Well Mode changed to Pumping
2006-11-16 Perforation Treatment Performed - Cement Plug
2006-11-16 Plug Back Performed
2006-11-16 Well Log Performed
2006-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-18 Plug Back Performed
2006-11-18 Well Fluid changed to Crude Oil
2006-11-18 Well Log Performed
2006-11-18 Well Mode changed to Abandoned Zone
2006-11-22 Perforation Treatment Performed - Cement Plug
2006-11-22 Plug Back Performed
2006-11-23 Perforation Treatment Performed - Cement Plug
2006-11-23 Plug Back Performed
2006-11-25 Well Log Performed
2006-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-28 Perforation Treatment Performed - Jet Perforation
2006-11-28 Perforation Treatment Performed - Remedial Casing
2006-11-28 Plug Back Performed
2006-11-28 Well Log Performed
2006-11-29 Perforation Treatment Performed - Jet Perforation
2006-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-02 Perforation Treatment Performed - Remedial Casing
2006-12-02 Plug Back Performed
2006-12-02 Well Log Performed
2006-12-04 Perforation Treatment Performed - Jet Perforation
2006-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-12-05 Perforation Treatment Performed - Remedial Casing
2006-12-05 Plug Back Performed
2006-12-07 Well Log Performed
2008-10-04 Well Abandoned
2008-10-04 Well Fluid changed to Crude Oil
2008-10-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-07-26 Perforation 2923.90 2924.90 7
2006-11-16 Cement Plug 1812.00 1820.00 0
2006-11-18 Packing Device Capped w/Cement 1762.00 1770.00 0
2006-11-22 Cement Plug 1437.20 1641.40 0
2006-11-23 Cement Plug 1178.00 1437.20 0
2006-11-28 Perforation 1168.00 1169.00 13
2006-11-28 Remedial Casing Cementing 1168.00 1169.00 0
2006-11-28 Packing Device Capped w/Cement 1106.90 1170.00 0
2006-11-29 Perforation 1060.00 1061.00 13
2006-12-02 Remedial Casing Cementing 1060.00 1061.00 0
2006-12-02 Packing Device Capped w/Cement 1025.00 1053.00 0
1964-07-26 Acid Wash 2923.90 2924.90 0
2006-12-04 Perforation 650.00 651.00 14
2006-12-05 Remedial Casing Cementing 650.00 651.00 0
2006-12-05 Packing Device Capped w/Cement 629.00 643.00 0
1969-03-11 Hydra Jet Perforation 2926.10 2926.10 0
1969-03-12 Cement Squeeze 2923.90 2926.10 0
1969-03-15 Perforation 2923.90 2924.90 13
1969-03-18 Acid Treatment 2923.90 2924.90 0
1983-01-07 Packing Device Capped w/Cement 2896.00 2910.00 0
1991-07-04 Perforation 1778.00 1784.00 13
1991-07-04 Fracture 1778.00 1784.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 3600 0.0 0.0 0.0
1992 6548 0.0 0.0 0.0
1993 7242 0.0 0.0 0.0
1994 6356 0.0 0.0 0.0
1995 3123 0.0 0.0 0.0
1997 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1964-06-07 Lost Circulation 152.40 213.30

For data sources see[6]

References