X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0365042006000

Well Details

Well ID: 0365042006000
Loading map...
Location: 00/06-20-036-04W5/0
Location Alias: 00/06-20-36-04 W5M
Location Alias 2: 00/06-20-036-04 W5/00
Country: Canada
Province: Alberta
Township: 036
Meridian: 5
Range: 04
Section: 20
County/Municipality: Red Deer County
Well Name: BEC SYLAKE 6-20-36-4
Operator Name: Bonavista Energy Corporation
License Number: 0131643
License Date: 1988-01-22
License Status: Issued
Spud Date: 1988-02-01
Final Drill Date: 1988-02-20
Well Total Depth: 2483.00 m
Surface Hole Latitude: 52.107606
Surface Hole Longitude: -114.539585

For data sources see[1][2]

Well History

Date Event
1988-01-22 Obtained License
1988-02-02 Lost Circulation Occurred
1988-02-04 Surface Casing Operation Performed
1988-02-20 Finished Drilling
1988-02-20 Well Log Performed
1988-02-22 Production Casing Operation Performed
1988-02-22 Rig Released
1988-03-01 Well Log Performed
1988-03-04 Well Log Performed
1988-03-05 Perforation Treatment Performed - Jet Perforation
1988-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-10 Perforation Treatment Performed - Fractured
1988-05-14 Well Log Performed
1988-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-15 Plug Back Performed
1988-05-16 Perforation Treatment Performed - Jet Perforation
1988-05-16 Well Log Performed
1988-05-20 Perforation Treatment Performed - Fractured
1988-05-26 Well Log Performed
1988-12-31 Well Mode changed to Drilled and Cased
1989-02-01 Well Began Production
1989-02-01 Well Fluid changed to Gas
1989-02-01 Well Mode changed to Flowing
2008-07-01 Well Fluid changed to Gas
2008-07-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-05 Perforation 2455.00 2457.00 13
1988-05-16 Perforation 2418.50 2420.00 13
1988-05-16 Perforation 2421.00 2422.00 13
1988-05-20 Fracture 2366.00 2422.00 0
1988-03-05 Perforation 2459.00 2462.50 13
1988-03-07 Acid Treatment 2455.00 2462.50 0
1988-03-10 Fracture 2455.00 2462.50 0
1988-05-15 Packing Device Capped w/Cement 2441.00 2449.00 0
1988-05-16 Perforation 2366.00 2367.00 13
1988-05-16 Perforation 2369.00 2370.00 13
1988-05-16 Perforation 2394.00 2397.00 13
1988-05-16 Perforation 2406.00 2407.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 2653 0.0 0.0 0.0
1990 5616 0.0 0.0 0.0
1991 5319 0.0 0.0 0.0
1992 5892 0.0 0.0 0.0
1993 8061 0.0 0.0 0.0
1994 8549 0.0 0.0 0.0
1995 8589 0.0 0.0 0.0
1996 8475 0.0 0.0 0.0
1997 8690 0.0 0.0 0.0
1998 8727 0.0 0.0 0.0
1999 8501 0.0 0.0 0.0
2000 8757 0.0 0.0 0.0
2001 8739 0.0 0.0 0.0
2002 8611 0.0 0.0 0.0
2003 8416 0.0 0.0 0.0
2004 8773 0.0 0.0 0.0
2005 8711 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8416 0.0 0.0 0.0
2008 8591 0.0 0.0 0.0
2009 8677 0.0 0.0 0.0
2010 8526 0.0 0.0 0.0
2011 8645 0.0 0.0 0.0
2012 8437 0.0 0.0 0.0
2013 8727 0.0 0.0 0.0
2014 8466 0.0 0.0 0.0
2015 8618 0.0 0.0 0.0
2016 8032 0.0 0.0 0.0
2017 8150 0.0 0.0 0.0
2018 8687 0.0 0.0 0.0
2019 7975 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-02-02 Lost Circulation 57.00 360.00

For data sources see[6]

References