X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374023204020

Well Details

Well ID: 0374023204020
Loading map...
Location: 02/04-32-037-02W4/0
Location Alias: 02/04-32-37-02 W4M
Location Alias 2: 02/04-32-037-02 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 02
Section: 32
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC 102 PROVOST 4-32-37-2
Operator Name: West Lake Energy Corp.
License Number: 0273906
License Date: 2002-09-18
License Status: Issued
Spud Date: 2002-10-03
Final Drill Date: 2002-10-05
Well Total Depth: 842.00 m
Surface Hole Latitude: 52.217452
Surface Hole Longitude: -110.260989

For data sources see[1][2]

Well History

Date Event
2002-09-18 Obtained License
2002-10-03 Surface Casing Operation Performed
2002-10-05 Finished Drilling
2002-10-05 Well Log Performed
2002-10-06 Production Casing Operation Performed
2002-10-06 Rig Released
2002-10-06 Well Mode changed to Drilled and Cased
2002-10-17 Perforation Treatment Performed - Jet Perforation
2002-10-17 Well Log Performed
2002-10-19 Perforation Treatment Performed - Jet Perforation
2002-10-19 Well Log Performed
2002-10-22 Well Began Production
2002-10-22 Well Fluid changed to Crude Oil
2002-10-22 Well Mode changed to Pumping
2006-07-14 Well Fluid changed to Crude Oil
2006-07-14 Well Mode changed to Suspended
2013-01-27 Perforation Treatment Performed - Cement Squeeze
2013-02-01 Perforation Treatment Performed - Jet Perforation
2013-02-03 Perforation Treatment Performed - Chemical Squeeze
2013-03-06 Well Began Injection
2013-03-06 Well Fluid changed to Water
2013-03-06 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-10-17 Perforation 813.00 814.50 14
2002-10-19 Perforation 814.50 816.00 14
2013-01-27 Cement Squeeze 813.00 816.00 0
2013-02-01 Perforation 820.00 825.00 20
2013-02-01 Perforation 825.00 830.00 20
2013-02-03 Chemical Squeeze 820.00 830.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1681 0.0 0.0 0.0
2003 8745 0.0 0.0 0.0
2004 7175 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-05 No Incident Encountered 0.00 0.00
2014-09-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References