X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374032101D20

Well Details

Well ID: 0374032101D20
Loading map...
Location: D2/01-21-037-03W4/0
Location Alias: D2/01-21-37-03 W4M
Location Alias 2: D2/01-21-037-03 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 03
Section: 21
County/Municipality: Special Areas No. 4
Well Name: WLEC 1D2 PROVOST 1-21-37-3
Operator Name: West Lake Energy Corp.
License Number: 0152028
License Date: 1992-03-17
License Status: Abandoned
Spud Date: 1992-04-20
Final Drill Date: 1992-04-22
Well Total Depth: 842.50 m
Surface Hole Latitude: 52.189466
Surface Hole Longitude: -110.363845

For data sources see[1][2]

Well History

Date Event
1992-03-17 Obtained License
1992-04-20 Surface Casing Operation Performed
1992-04-21 Direction Drilling Operation Performed - Deviate
1992-04-22 Finished Drilling
1992-04-22 Well Mode changed to Drilled and Cased
1992-04-23 Production Casing Operation Performed
1992-04-23 Rig Released
1992-04-23 Well Log Performed
1992-05-16 Well Log Performed
1992-05-18 Perforation Treatment Performed - Open-Hole Completion
1992-07-18 Well Began Production
1992-07-18 Well Fluid changed to Crude Oil
1992-07-18 Well Mode changed to Flowing
1992-08-14 Perforation Treatment Performed - Open-Hole Completion
1992-08-17 Perforation Treatment Performed - Jet Perforation
1994-12-13 Well Fluid changed to Crude Oil
1994-12-13 Well Mode changed to Pumping
1996-10-31 Well Fluid changed to Crude Oil
1996-10-31 Well Mode changed to Suspended
2009-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-02-19 Plug Back Performed
2009-02-19 Well Fluid changed to Crude Oil
2009-02-19 Well Mode changed to Abandoned Zone
2018-10-23 Well Abandoned
2018-10-23 Well Fluid changed to Crude Oil
2018-10-23 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-04-21 136.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-05-18 Open Hole/Barefoot Completion 836.00 840.00 0
1992-08-14 Open Hole/Barefoot Completion 836.00 842.50 0
1992-08-17 Perforation 840.50 842.50 13
2009-02-19 Packing Device Capped w/Cement 818.00 826.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3243 0.0 0.0 0.0
1993 8488 0.0 0.0 0.0
1994 7253 0.0 0.0 0.0
1995 8192 0.0 0.0 0.0
1996 2662 0.0 0.0 0.0

For data sources see[6]

References