X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374070606000

Well Details

Well ID: 0374070606000
Loading map...
Location: 00/06-06-037-07W4/0
Location Alias: 00/06-06-37-07 W4M
Location Alias 2: 00/06-06-037-07 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 07
Section: 06
County/Municipality: Special Areas No. 4
Well Name: KARVE PROVOST 6-6-37-7
Operator Name: Karve Energy Inc.
License Number: 0131757
License Date: 1988-01-28
License Status: RecCertified
Spud Date: 1988-02-02
Final Drill Date: 1988-02-05
Well Total Depth: 1015.00 m
Surface Hole Latitude: 52.150108
Surface Hole Longitude: -110.998082

For data sources see[1][2]

Well History

Date Event
1988-01-28 Obtained License
1988-02-02 Surface Casing Operation Performed
1988-02-05 Finished Drilling
1988-02-05 Well Log Performed
1988-02-06 Drill Stem Test Performed
1988-02-07 Production Casing Operation Performed
1988-02-07 Rig Released
1988-02-07 Well Mode changed to Drilled and Cased
1988-11-21 Well Log Performed
1988-11-22 Perforation Treatment Performed - Jet Perforation
1988-11-23 Well Log Performed
1989-02-09 Well Began Injection
1989-02-09 Well Fluid changed to Water
1989-02-09 Well Type changed to Injection
1991-08-01 Well Log Performed
1991-08-10 Perforation Treatment Performed - Jet Perforation
1991-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-01 Well Fluid changed to Water
1997-12-01 Well Mode changed to Suspended
1997-12-01 Well Type changed to Injection
1999-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-01 Plug Back Performed
1999-06-05 Well Abandoned
1999-06-05 Well Fluid changed to Water
1999-06-05 Well Mode changed to Abandoned
1999-06-05 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-11-22 Perforation 1001.50 1003.50 13
1991-08-10 Perforation 993.50 994.50 13
1991-08-10 Perforation 997.00 1000.00 13
1991-08-10 Perforation 1001.00 1005.50 13
1991-08-28 Acid Treatment 993.50 1005.50 0
1999-06-01 Packing Device Capped w/Cement 971.00 979.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0

For data sources see[5]

References