X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374132110000

Well Details

Well ID: 0374132110000
Loading map...
Location: 00/10-21-037-13W4/0
Location Alias: 00/10-21-37-13 W4M
Location Alias 2: 00/10-21-037-13 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 13
Section: 21
County/Municipality: County of Paintearth No. 18
Well Name: ACL ET AL PROVOST 10-21-37-13
Operator Name: Karve Energy Inc.
License Number: 0044797
License Date: 1973-01-11
License Status: RecCertified
Spud Date: 1973-01-21
Final Drill Date: 1973-01-26
Well Total Depth: 1085.10 m
Surface Hole Latitude: 52.196684
Surface Hole Longitude: -111.797986

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-01-11 Obtained License
1973-01-25 Drill Stem Test Performed
1973-01-26 Finished Drilling
1973-01-27 Drill Stem Test Performed
1973-01-28 Production Casing Operation Performed
1973-01-28 Well Mode changed to Drilled and Cased
1973-02-03 Perforation Treatment Performed - Jet Perforation
1973-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-05 Perforation Treatment Performed - Cement Squeeze
1975-03-06 Perforation Treatment Performed - Jet Perforation
1975-12-08 Well Began Production
1975-12-08 Well Fluid changed to Gas
1975-12-08 Well Mode changed to Flowing
1994-11-01 Well Fluid changed to Gas
1994-11-01 Well Mode changed to Suspended
1996-07-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-02 Plug Back Performed
1996-07-03 Well Abandoned
1996-07-03 Well Fluid changed to Gas
1996-07-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-02-03 Perforation 1067.70 1068.90 7
1973-02-05 Acid Treatment 1067.70 1068.90 0
1975-03-05 Cement Squeeze 1067.70 1068.90 0
1975-03-06 Perforation 980.50 982.10 7
1996-07-02 Packing Device Capped w/Cement 967.50 975.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 37 0.0 0.0 0.0
1976 7614 0.0 0.0 0.0
1977 8401 0.0 0.0 0.0
1978 8325 0.0 0.0 0.0
1979 7573 0.0 0.0 0.0
1980 7764 0.0 0.0 0.0
1981 8159 0.0 0.0 0.0
1982 8595 0.0 0.0 0.0
1983 8672 0.0 0.0 0.0
1984 8504 0.0 0.0 0.0
1985 8327 0.0 0.0 0.0
1986 8218 0.0 0.0 0.0
1987 7259 0.0 0.0 0.0
1988 8558 0.0 0.0 0.0
1989 6141 0.0 0.0 0.0
1990 5607 0.0 0.0 0.0
1991 3578 0.0 0.0 0.0
1992 1776 0.0 0.0 0.0
1994 96 0.0 0.0 0.0

For data sources see[5]

References