X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374132907000

Well Details

Well ID: 0374132907000
Loading map...
Location: 00/07-29-037-13W4/0
Location Alias: 00/07-29-37-13 W4M
Location Alias 2: 00/07-29-037-13 W4/00
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 13
Section: 29
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 7-29-37-13
Operator Name: Karve Energy Inc.
License Number: 0050454
License Date: 1974-07-15
License Status: Issued
Spud Date: 1974-08-17
Final Drill Date: 1974-08-23
Well Total Depth: 1068.30 m
Surface Hole Latitude: 52.205897
Surface Hole Longitude: -111.821405

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-07-15 Obtained License
1974-08-23 Finished Drilling
1974-08-23 Well Mode changed to Drilled and Cased
1974-08-24 Drill Stem Test Performed
1974-08-24 Production Casing Operation Performed
1974-09-18 Perforation Treatment Performed - Jet Perforation
1975-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-09-28 Perforation Treatment Performed - Jet Perforation
1975-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-09-29 Perforation Treatment Performed - Fractured
1975-10-07 Perforation Treatment Performed - Jet Perforation
1975-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-08 Perforation Treatment Performed - Fractured
1977-04-29 Well Began Production
1977-04-29 Well Fluid changed to Gas
1977-04-29 Well Mode changed to Flowing
1981-11-25 Well Fluid changed to Gas
1981-11-25 Well Mode changed to Suspended
1991-11-01 Well Fluid changed to Gas
1991-11-01 Well Mode changed to Flowing
1999-02-15 Well Structure changed to Commingled
1999-02-16 Well Fluid changed to Gas
1999-02-16 Well Mode changed to Flowing
2003-02-01 Well Fluid changed to Gas
2003-02-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-09-18 Perforation 1055.80 1057.70 7
1975-10-08 Fracture 951.60 960.70 0
1975-09-27 Packing Device Capped w/Cement 1043.90 1051.60 0
1975-09-28 Perforation 997.30 998.50 13
1975-09-29 Acid Treatment 997.30 998.50 0
1975-09-29 Fracture 997.30 998.50 0
1975-10-07 Perforation 951.60 952.80 7
1975-10-07 Perforation 954.30 954.90 7
1975-10-07 Perforation 959.80 960.70 7
1975-10-08 Acid Treatment 951.60 960.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 5274 0.0 0.0 0.0
1978 833 0.0 0.0 0.0
1991 1384 0.0 0.0 0.0
1992 7772 0.0 0.0 0.0
1993 7746 0.0 0.0 0.0
1994 7706 0.0 0.0 0.0
1995 6377 0.0 0.0 0.0
1996 8727 0.0 0.0 0.0
1997 8437 0.0 0.0 0.0
1998 7893 0.0 0.0 0.0
1999 7778 0.0 0.0 0.0
2000 7065 0.0 0.0 0.0
2001 8487 0.0 0.0 0.0
2002 8003 0.0 0.0 0.0
2003 8546 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 7650 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8667 0.0 0.0 0.0
2010 8692 0.0 0.0 0.0
2011 8664 0.0 0.0 0.0
2012 7463 0.0 0.0 0.0
2013 8352 0.0 0.0 0.0
2014 8479 0.0 0.0 0.0
2015 8644 0.0 0.0 0.0
2016 8638 0.0 0.0 0.0
2017 8640 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8610 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References