X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0374132907002

Well Details

Well ID: 0374132907002
Loading map...
Location: 00/07-29-037-13W4/2
Location Alias: 00/07-29-37-13 W4M
Location Alias 2: 00/07-29-037-13 W4/02
Country: Canada
Province: Alberta
Township: 037
Meridian: 4
Range: 13
Section: 29
County/Municipality: County of Paintearth No. 18
Well Name: ACL PROVOST 7-29-37-13
Operator Name: Karve Energy Inc.
License Number: 0050454
License Date: 1974-07-15
License Status: Issued
Spud Date: 1974-08-17
Final Drill Date: 1974-08-23
Well Total Depth: 1068.30 m
Surface Hole Latitude: 52.205897
Surface Hole Longitude: -111.821405

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-07-15 Obtained License
1974-08-23 Finished Drilling
1974-08-23 Well Mode changed to Drilled and Cased
1974-08-24 Drill Stem Test Performed
1974-08-24 Production Casing Operation Performed
1974-09-18 Perforation Treatment Performed - Jet Perforation
1975-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-09-28 Perforation Treatment Performed - Jet Perforation
1975-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-09-29 Perforation Treatment Performed - Fractured
1975-10-07 Perforation Treatment Performed - Jet Perforation
1975-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-08 Perforation Treatment Performed - Fractured
1975-12-08 Well Began Production
1975-12-08 Well Fluid changed to Gas
1975-12-08 Well Mode changed to Flowing
1992-06-01 Well Fluid changed to Gas
1992-06-01 Well Mode changed to Suspended
1999-02-15 Well Fluid changed to Gas
1999-02-15 Well Mode changed to Suspended
1999-02-16 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-09-18 Perforation 1055.80 1057.70 7
1975-10-08 Fracture 951.60 960.70 0
1975-09-27 Packing Device Capped w/Cement 1043.90 1051.60 0
1975-09-28 Perforation 997.30 998.50 13
1975-09-29 Acid Treatment 997.30 998.50 0
1975-09-29 Fracture 997.30 998.50 0
1975-10-07 Perforation 951.60 952.80 7
1975-10-07 Perforation 954.30 954.90 7
1975-10-07 Perforation 959.80 960.70 7
1975-10-08 Acid Treatment 951.60 960.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 249 0.0 0.0 0.0
1976 7890 0.0 0.0 0.0
1977 8223 0.0 0.0 0.0
1978 8538 0.0 0.0 0.0
1979 4877 0.0 0.0 0.0
1980 7769 0.0 0.0 0.0
1981 8266 0.0 0.0 0.0
1982 8393 0.0 0.0 0.0
1983 8710 0.0 0.0 0.0
1984 8773 0.0 0.0 0.0
1985 8657 0.0 0.0 0.0
1986 8533 0.0 0.0 0.0
1987 8164 0.0 0.0 0.0
1988 8654 0.0 0.0 0.0
1989 8471 0.0 0.0 0.0
1990 8413 0.0 0.0 0.0
1991 7336 0.0 0.0 0.0
1992 1488 0.0 0.0 0.0

For data sources see[5]

References